article thumbnail

Three Easy Steps to Building a Commercial Building

Wolgast Corporation

Three-Phases to Design-Build Construction: Preliminary Design and Estimating Detailed Construction Drawings and Bidding Construction Step One/Phase I – Preliminary Design and Estimating In this First Step or Phase our Architect develops plans based on a needs analysis meeting with the building owner and representatives for a nominal fee.

article thumbnail

“Innovation is purposeful”: How Skanska’s Sr. Precon Technologist Drives Change

Autodesk Construction Cloud

When solutions are simple to use, it takes less motivation to get people to step out of their comfort zone and try new things. In general, people have a hard time visualizing a mental picture of 2D construction documents. We utilize a similar cloud-based workflow when coordinating shop drawing models with our subcontractors.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

All About Pony Wall | What Is a Pony Wall | Uses of Pony Wall | Pros and Cons of Pony Wall

CivilJungle

It must be hard to construct an indoor pattern image for a clear- notion surface idea from time to time, and the pony wall will apply to separate zones with many purposes for living room or dining. The laundry room will make by designing a pony wall among both the drawing room as an entry and shoes as exterior items left beyond the wall.

article thumbnail

Construction Cost Estimating Blog: BIM authorizing estimating.

Construction Cost Estimating

Building Information Modeling (BIM) generates a complete digital model of the building that can produce exact bill of material and cost estimate along with coordinated drawings and details. Innovaya Visual Estimating. BIM authorizing estimating software can enhance the estimating process to a great extent. SmartBIM QTO. Blog Archive.

article thumbnail

Current and Future Use of BIM – 2013 – UK

Building Information Management

A designer’s primary interest is for example the spatial structure, a structural engineer’s primary interest is the load bearing structure, while an energy engineer is interested in climate zones. QTO, and an exclusively enhanced 400,000 line itme RSMeans Cost database.

BIM 65
article thumbnail

Construction Cost Estimating Blog: The Technique of Construction.

Construction Cost Estimating

The agreement of the estimated cost with the actual cost will depend on accurate use of estimating methods and correct visualization of the work, as it will be done. To enable an estimator to take out the quantities accurately, the drawings must themselves be clear, true to the fact and scale, complete, and fully dimensioned.

article thumbnail

Data Scientists Reveal 5 Surprising Construction Insights to Manage Risk 

Autodesk Construction Cloud

However, data visualization tools, like Autodesk’s Dashboards, Reports, Project Home, and machine learning technology like Construction IQ are now doing this for us, organizing, interpreting, and uncovering patterns in a faster and more comprehensive way than before. “I So the next question we asked is what led up to those changes?

Risk 52