article thumbnail

What Are As Built Drawings?

Autodesk Construction Cloud

If a picture can speak a thousand words, in a project, as-built drawings can speak a thousand construction processes. Nonetheless, as-built drawings remain an essential process in a project, especially to maintain a project’s lifecycle after construction has ended. . Shop drawing changes. Key Takeaways. What Is an “As-Built?” .

article thumbnail

Three Easy Steps to Building a Commercial Building

Wolgast Corporation

Three-Phases to Design-Build Construction: Preliminary Design and Estimating Detailed Construction Drawings and Bidding Construction Step One/Phase I – Preliminary Design and Estimating In this First Step or Phase our Architect develops plans based on a needs analysis meeting with the building owner and representatives for a nominal fee.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Over 275 Partners Now Integrate with Autodesk Construction Applications 

Autodesk Construction Cloud

Now, project managers can visualize 3D models generated in Metaroom directly into Autodesk Build Insights or BIM 360 Project Home dashboards. DataSeer allows construction professionals to identify, extract, and convert unstructured drawings and documents into standardized output formats, including CSV and CAD files automatically.

Autodesk 118
article thumbnail

What’s the difference between RFIs, Submittals and Specifications?

Fieldwire

In construction, a Request For Information (RFI) seeks the clarification of plans, drawings, specifications, and agreements. During the construction process, the contractor encounters a discrepancy between the architectural plans and the structural drawings.

article thumbnail

Your Guide to Preconstruction Planning

Autodesk Construction Cloud

At this point, the architect comes up with a set of drawings for the project—often referred to as the construction documents. When the design process is complete, teams would need to submit the documents to the city in order to secure the necessary building permits. Maybe the contractor is waiting for the city to issue a permit.

Plans 52
article thumbnail

Integrated project delivery method

Job Order Contracting

All real property owners who manage renovation, repair, maintenance or new construction projects need a Common Data Environment to develop, store, and distribute all relevant drawings, BIM models, documents, activities, and processes to all the relevant stakeholders. Owners are becoming increasingly focused on demanding more value.

article thumbnail

All About Pony Wall | What Is a Pony Wall | Uses of Pony Wall | Pros and Cons of Pony Wall

CivilJungle

It provides a rigid base to join a siding and permits more wall places to hang photos. The laundry room will make by designing a pony wall among both the drawing room as an entry and shoes as exterior items left beyond the wall. Also Read, How to Draw a House Plan Step by Step. Staircase Entryway. Child Space.