Remove Electrical Remove Foundation Remove Permits Remove Zoning
article thumbnail

Phases of Commercial Real Estate Development

Construction Marketing

This includes analyzing factors such as zoning regulations, transportation access, and market demand. After acquiring the property, the developer must design and plan the project, considering factors such as building codes and zoning regulations, the intended use of the property, and the target market.

article thumbnail

Three Easy Steps to Building a Commercial Building

Wolgast Corporation

This preliminary phase includes a floorplan, exterior elevations (if applicable), code and zoning checks, and an initial engineering analysis. We also gain all permit approvals, get materials ordered, and trade contractors scheduled for construction to commence at this time.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Off-Grid Monolithic Cob House

Natural Building

It has a 1-kilowatt solar power system and a backup generator for electricity, a propane radiant in-floor heating system and a Rumford fireplace for heat, and a constructed wetland for natural wastewater treatment. Since it was built in a seismic zone, the home had to be engineered and built to withstand earthquakes.

Housing 75
article thumbnail

How to Build a Pool Surviving the Inground Pool Construction Inspections

Construction Cost Estimating

In most areas of the country when building an inground pool, permits along with inspections are required as with any construction process. Structural, Electrical and Plumbing inspections during construction, and a Final inspection when you finish building your inground pool.

article thumbnail

All About Site Preparation | What Is Site Preparation | Types of Site Preparation

CivilJungle

Soil testing charts many dissimilarity facts such as kind of foundation good for the site, agreement and linked guidance, rainfall chance, slope solidity, underground water level, soil power, soil categorized, and various details offered in the surveying reports. Check Zoning and Permitting with the Local Governing Body.

Site 52
article thumbnail

REINFORCEMENT CORROSION-CAUSES & PREVENTION

The Constructor

Concrete is capable of conducting and electric current and acts as the electrolyte with the circuit being completed by the bar through which the electrons can flow. MINIMISING THE RISK OF CORROSION: The quality and depth of concrete in the cover zone are all important in minimizing the risk of corrosion as shown in fig.

Concrete 235
article thumbnail

Managing Moisture in Walls

Pro Builder

Well-installed WRBs are important in all climate zones. . Foam the openings at the back of electrical boxes. Consider installing a capillary break between the spread footing and foundation walls for basements and crawlspaces. • On the interior, use the drywall as an air barrier. Photos: courtesy IBACOS.