article thumbnail

Phases of Commercial Real Estate Development

Construction Marketing

This includes analyzing factors such as zoning regulations, transportation access, and market demand. After acquiring the property, the developer must design and plan the project, considering factors such as building codes and zoning regulations, the intended use of the property, and the target market.

article thumbnail

Three Easy Steps to Building a Commercial Building

Wolgast Corporation

This preliminary phase includes a floorplan, exterior elevations (if applicable), code and zoning checks, and an initial engineering analysis. We also gain all permit approvals, get materials ordered, and trade contractors scheduled for construction to commence at this time.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Aging in Place: My Aunt Nancy’s New ADU

Pro Builder

The family had implicit trust in the contractor due to their previous relationship, a situation that turned out to have a downside as Toni came to regret a loose approach to planning the addition, especially regarding the permitting process. They only found out about this stipulation after they applied for the construction permit. .

Permits 98
article thumbnail

Off-Grid Monolithic Cob House

Natural Building

Since it was built in a seismic zone, the home had to be engineered and built to withstand earthquakes. It was built with curved walls to strengthen the structure, as well as with airplane cables that connect the wall plate to the foundation in order to resist lateral forces.

Housing 75
article thumbnail

All Solar Panels are Pervious in Maryland

Green Building Law Update

This is significant because regulating impervious surface on a property, either by establishing a maximum allowable area or a ratio of impervious surface to the total lot area, is a common zoning performance standard used by local governments in Maryland and elsewhere. The law is not unique to Maryland.

Maryland 120
article thumbnail

Step-by-step guidelines to develop a concrete block wall

Construction Cost Estimating

No of wall or fence should be permissible inside 36” of a fire hydrant and no wall, fence or foundation should be permissible inside 12” of a water meter. Makin proper plan to adjust the height, location and design of the wall on the basis of the zone, location on the community design standards.

article thumbnail

All About Site Preparation | What Is Site Preparation | Types of Site Preparation

CivilJungle

Soil testing charts many dissimilarity facts such as kind of foundation good for the site, agreement and linked guidance, rainfall chance, slope solidity, underground water level, soil power, soil categorized, and various details offered in the surveying reports. Check Zoning and Permitting with the Local Governing Body.

Site 52