Remove Engineering Remove Environment Remove Fabrication Remove Visualization
article thumbnail

Connecting it all: Role of joints as a primary component

Construction Specifier

Photos courtesy Hoffmann Architects + Engineers. However, when examined more closely, they are discovered to be capable of dynamic interactions between assembly materials and with their surrounding environments. How can joints represent a marriage between pragmatic responsibility and visual poetry? By Richard W.

AIA 67
article thumbnail

AEC Collection Workflows: Dynamo for Structure

BIM & Beam

The visual programming interface of Dynamo for Revit is enabling structural engineers with the tools to build structural models with minimal energy and make their own structural design tools. Within Dynamo structural engineers can automate processes in Revit, and build complex and logic structures with minimal energy.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Building beyond boundaries: BIM and the data revolution in construction

Fieldwire

Creating an environment that values innovation, technology integration, and continuous learning is crucial to inspire and engage young professionals, propelling the industry forward into a new era of excellence. Additionally, attracting and retaining skilled labor is a pressing concern.

BIM 52
article thumbnail

Expanding the exterior footprint

Construction Specifier

Evidence of this trend in focus for healthier environments is highlighted by one of the top architectural firms: “Now more than ever, public spaces are poised to become the grand lobbies and public waiting rooms of neighborhoods and cities,” says Gensler associate Michael Wagner on the company’s blog.

article thumbnail

The mall of the future

BD+C

Anthony Sanchez, Design Director, Principal, and Josh Loree, Marketing Coordinator Retail Centers Shopping Centers Contractors Designers Designers / Specifiers / Landscape Architects Engineers Facility Managers Architects Building Owners It’s no secret that malls across the country are in trouble.

Retail 89
article thumbnail

What’s the difference between RFIs, Submittals and Specifications?

Fieldwire

The contractor can submit an RFI to the architect or engineer requesting additional information or clarification on the discrepancy. The contractor needs clarification to ensure that the project meets the intended design and specifications. A larger project, with dozens of subs, may have 500 or more individual submittals.

article thumbnail

Workforce Training: Engineering A Skilled Workforce

Buisness Facilities Contributed Content

We found top-class universities and a great community college, with programs dedicated to the mechatronics sector that will grow excellent young engineers with the skills necessary to run Eldor’s advanced automated lines.”. In Huntsville, AIDT is focused on building upon the region’s engineering and manufacturing prowess.