article thumbnail

Job Order Contracting Guide

Job Order Contracting

GENERAL – Cost data is organized using MasterFormat2004+ [1] and includes detailed line item description and associated material, equipment and labor as appropriate. BEST VALUE – As noted, all unit price line item provided incorporate locally research labor, material, and equipment costs.

Contract 100
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. coefficient (reference table of allowable overhead). authorization.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Expanding the exterior footprint

Construction Specifier

In environments like this, where building materials must maintain a high level of both performance and aesthetic, metal fabric is an ideal material for expanding the exterior footprint of existing buildings. Metal mesh alone may be used to create custom-designed sun shading and overhead pergolas in a variety of finishes and metal alloys.

article thumbnail

Top 10 Water Tank Brands in India

CivilJungle

fabricate custom made storage tanks perfectly fitting the location and capacity criteria of our clients and carry out professional installation within the stipulated time frame. 2017: Expansion at coimbatore unit, especially for custom molding, road safety equipment, milk cans, pallets & crate. Road Safety Equipments.

article thumbnail

WorkSafe BC Directors Approve OHS Amendments

Safety Services Company

Part 12, Tools, Machinery and Equipment. This amendment will ensure that the regulation applies to hand-fed circular saws equipped with any type of blade, rather than only to those with rip-type teeth. Part 12, Tools, Machinery and Equipment; and consequential amendments to Part 23, Oil and Gas. Part 16, Mobile Equipment.

Safety 49
article thumbnail

3 Ways to Take Construction Asset Tracking to the Next Level 

Autodesk Construction Cloud

Assets include system components, moveable equipment, building materials, or even rooms or areas. There are budgets to manage, timelines to hit, stakeholders to align—and, of course, a whole lot of construction assets to track. All of that can then be toggled with the barcode feature that can read traditional barcodes and QR codes.

article thumbnail

What are Independent Government Estimates – IGEs?

Building Information Management

This means the estimate should include (1) the direct costs incident to the construction; (2) an allowance for indirect or overhead costs; and (3) an allowance for a reasonable amount of profit. This price would include the cost of cement, aggregate, reinforcing steel and forms, but it usually excludes all overhead and profit.