The Simple Guide to Repair, Renovation, Construction Cost Control

Job Order Contracting

Elements such a collecting, measuring, monitoring and distributing important information are easily accomplished throughout program and project duration due to the LEAN framework of processes and tools. Training and Change Management The combining of good people, processes, information, and enabling technology drives optimal outcomes.

article thumbnail

Job Order Contract Coefficient – Training 101

Building Information Management

Which costs many or may not be included in the coefficient should be clearly spelled out in the JOC Request for Information, Request for Proposal, and/or Solicitation. Examples of costs that may be included in the coefficient include: General and administrative and other overhead costs. contractor’s profit. insurance costs.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The 7 Biggest Construction Safety Stories of 2020

Construction Junkie

The coronavirus pandemic placed the notion of “people over profits” under the microscope, while also balancing the needs of their employees to continue to make an income under difficult circumstances. That can leave you in a legal bind personally. For more information, check out our full article by clicking or tapping here.

Safety 111
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). The UPB costs should NOT include contractor overhead and profit.

Contract 100
article thumbnail

What Is an Insurance Endorsement? A Contractor’s Guide

Levelset

The amendment will provide detailed information on the endorsement along with a separate notice of how much the change in coverage might cost. . In that case, the owners could legally seek damages from your company. An endorsement, — also known as an insurance rider — adds, deletes, or changes your insurance coverage.

article thumbnail

Worldwide Need for Construction Collaboration

Building Information Management

Standardized, Common Information for Costs, Materials, Equipment, Processes (i.e. Ability to store and reuse information. Average procurement time. %/# and value of legal disputes. are: shorter procurement times, fewer change orders, virtual elimination of legal disputes, and more projects completed on-time and on-budget.

article thumbnail

Construction Cost Estimating Software vs. Spreadsheets – State of the Nation 2012

Building Information Management

Construction estimating involves the estimating of material, labor, equipment, overhead/profit and contingencies. For example, data entry remains tedious and prone to error, formula error are common, and collaboration and information sharing are limited. Christofferson, Jay. Nickols, Robert Duane.