Remove Life Cycle Remove Management Remove Reference
article thumbnail

Construction Equation: Knowledge Problems + Data Problems + Management Problems = Outcome Problems

Job Order Contracting

Fundamental math for every real property owner… Knowledge Problems + Data Problems + Management Problems = Outcome Problems. Management Problems. Knowledge Problems + Data Problems + Management Problems = Outcome Problems. Knowledge Problems + Data Problems + Management Problems = Outcome Problems. References.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Consequently, the need for value management emerges.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Life-cycle Management of the Built Environment – BIM – Current Status

Building Information Management

That is to say that the “life-cycle management of the built environment supported by digital technology” is not being practiced in an efficient, transparent, consistent manner by many, if any, public or private sector Owners. The question is why? References. Navigli, P. Velardi, R. Navigli, P.

article thumbnail

Integrated Construction Planning, Procurement, and Project Delivery Solution

Job Order Contracting

The ultimate benefit provided by integrated construction planning, procurement, and project delivery solution is significantly improved life-cycle total cost of ownership asset management. References: • Abdirad, H., & Dossick, C. Engineering, Construction and Architectural Management, 26(1), 104–. Team Culture.

article thumbnail

COBIE – BIM – Life-cycle Facility Managment

Building Information Management

The Construction-Operations Building information exchange (COBie) format is the international standard for the exchange of information about managed facility assets. The correct application of the COBie Guide may then be reference directly in appropriate specifications. Bill East, PhD, PE, F.ASCE1, Mariangelica Carrasquillo-Mangual 2.

article thumbnail

” Evidence-based ” Life-cycle Federal Facility Management, BIM, and the Status Quo – NIBS, FFC

Building Information Management

Key Topics / Take Aways: Identify and advance technologies, processes, and management practices that improve the performance of federal facilities over their entire life-cycle, from planning to disposal. You can’t manage what you don’t measure. Expected Life-cycle and Deterioration Rates for Physical Assets.

article thumbnail

Essential BIM Terminology

Viewpoint Construction Technology

The asset information model is a maintained information model used to manage, control, and operate a respective asset. AIM is required to support an organization’s asset management system. The project information model refers to the design and construction stage. Life-Cycle Assessment. BIM Execution Plan.

BIM 189