Remove Modeling Remove Roads Remove Schedule Remove Zoning
article thumbnail

don't think: Do Revit: Taking Revit Server "off-road"

Do

Taking Revit Server "off-road". So as long as they cut a local before leaving the main office, and SWC when they get back, it could work very well (as long it does not hold up other people attempting to work on the model at the same time). The other thing to keep in mind is that RS only caches the model data to the Local Servers.

Revit 48
article thumbnail

The tale of two BIM-stillborns and the relativity of time in developing global BIM to a useful level

DebunkTheBIM

And it does NOT mean that everyone is modelling in a 2000+ company, no, but neither does it mean that only 5-10 people in that 2000 people company do the modelling and every project has ‘some modelling’ associated with it). Other would read data from the models, analyze and repurpose. Nothing less.

BIM 48
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Can We Make Home Building a Little Less ‘Interesting?’

Pro Builder

The Colorado Springs model for bringing back trade skills training in high schools is spreading. Be honest with yourself: Can you describe your startups as a finely honed process with all plans, specification, selections, options, colors, and sales collateral materials complete before construction of the first model begins?

Overhead 105
article thumbnail

Housing, Industrialized: Your Road Map to Off-Site Construction

Pro Builder

Housing, Industrialized: Your Road Map to Off-Site Construction. Faster and more reliable scheduling. The road map will outline a successful transition of a builder’s overall business model—not just the construction silo—to fully integrate IC into its operations and realize IC’s benefits. Mon, 10/04/2021 - 14:02.

Roads 116
article thumbnail

Cool Planet Energy Systems Announces $168 Million Investment In Louisiana Bio-Refineries

Buisness Facilities Contributed Content

The third site is scheduled to come online in late 2016 at a Louisiana site to be determined. The fuel will be compatible for use in existing vehicles on the road today. The company’s business model calls for developing 400 of the micro-refineries across the U.S. in the next decade. Rocky Mountains U.S.

article thumbnail

Construction Cost Estimating Blog: Overview of construction.

Construction Cost Estimating

Overview of construction scheduling techniques. The construction industries should form accurate construction schedule techniques to ensure the effective coordination of work. The mostly used scheduling techniques in construction project is described below :-. Q Scheduling. Free Online Bar Chart Construction Schedule.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

From a technical point of view HVACie is an extention of the IFC Coordination Model View Definition. . Ontology for Life-Cycle Modeling of Heating, Ventilating, and Air Conditioning (HVAC) Systems. Model View Definition. 6049 Shoo Fly Road Kelsey, CA 95667. Model View Definition. 2012-03-01-CERL-CR-12-2-ModelView.