article thumbnail

CONSTRUCTION PROJECT FAILURE FACTORS

Job Order Contracting

4 Failure to leverage granular construction-based line of granular tasks and associated labor, material, equipment, and productivity information Inconsistency in planning and scope management, poor communication, and failure to address stakeholder engagement can be rectified. References: Atkinson, R. Construction project management.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Locally researched labor, material, equipment, and productivity data is essential in the devlopement of a credible construction cost estimate. ENR economic index, etc.) applied to a outdated cost estimate will introduce significant error. 3# Local Market – All cost data must be based upon local market conditions.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. How about instead having a Rooms explorer, like you can explore Schedules, Sheets and Families? Whadya think?

Revit 56
article thumbnail

Revit OpEd: Kitchen Equipment - RW Smith BIM Booklet

Revit OpEd

Kitchen Equipment - RW Smith BIM Booklet. 1 comment: Suppliers of Catering Equipment. Delete Sheets In Browser or Schedules. Kitchen Equipment - RW Smith BIM Booklet. ► 2004. (2). ► December 2004. (1). ► November 2004. (1). ► 2004. (2). ► December 2004. (1).

Revit 71
article thumbnail

Civil Engineering Marvels- 5 Tallest Skyscrappers

The Constructor

Taipei 101 received the Emporis Skyscraper Award in 2004. They were the world’s tallest buildings from 1998 to 2004 if measured from the level of the main entrance to the structural top, the original height reference used by the US-based Council on Tall Buildings and Urban Habitat from 1969. Related posts: civil engineering?

article thumbnail

Public Sector Real Property Management – Quality Construction Cost Estimating – Earned Value Management

Building Information Management

GAO and other studies/reports consistently report that errors and lack of due diligence with respect to original construction cost estimates are primary reasons for negative cost and schedule impacts, and overall poor project performance and outcomes.

article thumbnail

London Olympics Construction Is Safest in Recent Times | ENR.

ENR Construction

Survey Schedule. He said official statistics show two fatalities during the 1996 Barcelona Olympics construction, one fatality during the 2000 Sydney Olympics construction, 14 killed during the 2004 Greece Olympics construction and 10 killed during construction for the 2008 Beijing Olympics. Banking & Credit Crisis. --> Companies.