article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. How about instead having a Rooms explorer, like you can explore Schedules, Sheets and Families? Whadya think?

Revit 56
article thumbnail

Facilities Management Key Performance Indicators

Job Order Contracting

30) Scheduling intensity. (31) 42) Quality of scheduling. (43) 43) Schedule realization rate. (44) 44) Schedule compliance. (45) 30) Scheduling intensity. (31) 42) Quality of scheduling. (43) 43) Schedule realization rate. (44) 44) Schedule compliance. (45) 30) Scheduling intensity. (31)

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Shorter construction schedules than planned. The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., 2004; Black et al., 2000; Grajek et al., 2000; Gransberg et al., Lower project related cost growth. Conflict prevention in.

article thumbnail

Revit OpEd: Panel Schedule and Load Calculation Addition

Revit OpEd

Panel Schedule and Load Calculation Addition. Panel Schedule and Load Calculation Addition. ► 2007. (77). ► December 2007. (1). ► November 2007. (7). ► October 2007. (5). ► September 2007. (4). ► August 2007. (11). ► July 2007. (7). Revit OpEd.

Revit 53
article thumbnail

PSMJ Resources Blog: Do Small Projects Need Schedules?

PSMJ Resources

Do Small Projects Need Schedules? Is it really critical that small projects have a schedule? Here are some of the most important reasons that schedules are developed: 1) First and foremost, you always want to get the work done on time. Without a schedule, it gets done when it gets done. Do Small Projects Need Schedules?

article thumbnail

Lean facility management with the Kanban system

Lets Build

The Kanban method was officially defined in 2007 as a model for the computing industry. Other projects are put on hold by this redirection of staff resources, causing other schedules to slip. Kanban boards are filled with coloured cards, rather like a Trello board, providing a top-down overview of project management.

article thumbnail

ABC National Convention – 2007 Student Construction Competition

C-School

“ABC’s Student Construction Management Competition brings together the top construction management students nationwide and gives them a glimpse into the real world of construction,” said Dave Meyer, 2007 ABC national chairman. Students competed in three areas: project management/scheduling; estimating and safety.

ABC 40