Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB). Owner regularly inspects the site.

article thumbnail

Preconstruction Meeting: A Quick Guide to Success   

Autodesk Construction Cloud

They ensure everyone is on the same page from the get-go, on topics as diverse as how change orders how the chain of communication will be handled on site. They also try to identify special considerations and forestall potential areas of complication that can lead to change orders.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

QA and QC in Construction

Fieldwire

Quality Control (QC) simply refers to the process of inspecting the product to identify and correct defects. The Request for Information, or RFI, process on most construction projects is the ongoing, often a daily routine of asking a question and getting an answer about something on the construction drawings. Watch Course

article thumbnail

The Complete Guide to Project Commissioning

Autodesk Construction Cloud

According to Whole Building Design Guide, “Buildings that are properly commissioned typically have fewer change orders , tend to be more energy-efficient, and have lower operation and maintenance cost.” Much like shipbuilding, the process involves a series of documenting, scheduling, and testing processes.

article thumbnail

Snappii offers some useful construction apps to perform various construction activities efficiently

Construction Cost Estimating

Various Apple or Android Apps are used to accomplish all the tasks like Construction Daily Log, Estimating, Operations and Tasks management, Equipment Inspection etc. Construction Equipment Inspection app – This app can deal with construction equipment. associated with the construction.

article thumbnail

Navigating challenges in construction administration

BD+C

Our AIA agreement outlines the appropriate procedures and processes for change orders. If they're not adhered to, it can result in complications such as failed inspections, non-compliance with codes, the need to resubmit changes to the city, pricing changes, and time wastage.

article thumbnail

The Life-cycle of a Job Order Contract

Building Information Management

The “Contract Specialist” in coordination with the PM sets up a joint site visit with the JOC Contractor to further defined project/”task order” requirements and establish are joint “scope of work” (SOW). Drawings, typically in PDF format, are included. Contractor Estimate. Owner Estimate.