article thumbnail

Supreme Court Permits State Law Claims Against Superfund Property

Green Building Law Update

EPA has managed an extensive cleanup at the site, working with Atlantic Richfield to remediate more than 800 residential and commercial properties; remove 10 million cubic yards of tailings, mine waste, and contaminated soil; cap in place 500 million cubic yards of waste over 5,000 acres; and reclaim 12,500 acres of land.

Claims 156
article thumbnail

Construction Cost Estimating, Location Factoring, and National Average Cost Data

Job Order Contracting

The RSMeans city cost index (CCI) and the Department of Defense area cost factor (ACF) index are two primary examples of location factor publications. The accuracy of cost estimates in the early phases varies within an expected range that spans from -100% to +200% ” “Using the results of this study, various commercial entities (e.g.,

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

4BT OpenCost(TM) Local Market Granular Cost Data an RSmeans Alternative?

Job Order Contracting

The RSMeans city cost index (CCI) and the Department of Defense area cost factor (ACF) index are two primary examples of location factor publications. The accuracy of cost estimates in the early phases varies within an expected range that spans from -100% to +200% ” “Using the results of this study, various commercial entities (e.g.,

article thumbnail

Happy New Year From DoD – The Proposed CMMC Rule Is Here

Federal Construction Contracting Blog

Department of Defense (DoD) published the much anticipated proposed rule for the revamped Cybersecurity Maturity Model Certification (CMMC) 2.0 For example, contractors subject to 252.204–7012 are already required to safeguard covered defense information in accordance with NIST SP 800-171. POA&Ms under Level 1 are not permitted.

article thumbnail

Electrical Component Shortage Requires Action

Pro Builder

Shortages of single-phase transformers and other components are preventing local jurisdictions from issuing building permits because there is no way to provide power to new homes. In addition to electrical transformers, switchboards and circuit breakers are also in short supply. The ongoing shortage is undermining the ability of U.S.

article thumbnail

RELi Could be Standard Practice in Nearly Every Real Estate Transaction

Green Building Law Update

is significant because it is widely suggested, just as a Phase I Environmental Site Assessment is now standard practice in nearly every commercial real estate transaction in this country, that in the future the same will be true of a resilience assessment. The launch of RELi 2.0 The Green Business Certification Inc.’s Of note, RELi 2.0

article thumbnail

RELi Could be Standard Practice in Nearly Every Real Estate Transaction

Green Building Law Update

is significant because it is widely suggested, just as a Phase I Environmental Site Assessment is now standard practice in nearly every commercial real estate transaction in this country, that in the future the same will be true of a resilience assessment. The launch of RELi 2.0 The Green Business Certification Inc.’s Of note, RELi 2.0