What’s the difference between RFIs, Submittals and Specifications?

Fieldwire

In construction, a Request For Information (RFI) seeks the clarification of plans, drawings, specifications, and agreements. The construction RFI is a formal written process in which parties, such as the contractor and designer, clarify information gaps in construction documents.

article thumbnail

Innovative Approaches and The Role of Reinforced Concrete

BIM & Beam

The Martin/Martin CES team has innovatively addressed the issue of fragmented fabrication drawing production that design and construction teams consistently encounter with today’s increasingly tight project delivery schedules. This process allows delivery of the first package of shop drawings (reviewed and approved!)

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

SHOP DRAWING creates maximum benefits for construction companies

Construction Cost Estimating

The shop drawing is a drawing or collection of set of drawings, diagrams, illustrations, schedules, and other data or information specifically generated or assembled by the contractor, supplier, manufacturer, subcontractor, or fabricator to demonstrate some portion of the work for the approval of architect or engineer.

article thumbnail

FORMWORK AND GOOD FORMWORK PROPERTIES

The Constructor

When concrete is fresh and in its liquid state it must be restrained within a mould in order for it to set in its required shape. A smooth outer surface provides the main support for the concrete as it sets. Concrete is approximately 2.4 Formwork is the term used to describe this mould. This is normally made of plywood.

Concrete 223
article thumbnail

Detail quality control methods in construction works

Construction Cost Estimating

This civil engineering article sheds light on the inspection method of various civil works as well as necessary documents to carry out an inspection at construction project. Construction activities and consequent inspection standard should be based on job site specifications, methods and drawings.

article thumbnail

The future of specifiers: The way forward

Construction Specifier

They see trends toward integrating information better, both with building information modeling (BIM) and drawings, and between teammates. He sees reliance on the full-time specifier continuing, but bridges being built slowly between that person and the drawings. They imagine specifiers will be increasingly integrated with their teams.

CSI 97
article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

2) poor communication between the fabricators and erectors. (3) 8) inadequate preparation and review of contract and shop drawings. (9) 3) Bad workmanship, which is often the result of failure to communicate the design decisions to the persons, involved in executing them. (4) 9) poor training of field inspectors. (10)