Remove Consulting Remove Modeling Remove Reference Remove Schedule
article thumbnail

Revit OpEd: Reference Plane IsReference Parameter

Revit OpEd

Reference Plane IsReference Parameter. This post reiterates concepts I wrote about many years ago, regarding the IsReference parameter assigned to Reference Planes. IsReference settings break down like this: Not a Reference - ignored by Revit in the project environment, still useful in a family to create "the bones". at 8:00 AM.

Revit 74
article thumbnail

Design-Build gets sweeter: Expanding a Hershey plant with a high-tech approach

The Korte Company

To manage the complexity of the project, we relied on a phased work schedule over two years. We also needed to adapt to shifting project parameters without blowing the budget or schedule. This was far more accurate than just referencing the facility’s original hand-drawn blueprints as a point of reference.

Design 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Rooms and areas can be deleted in model views like floor plans and ceiling plans. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. Whadya think?

Revit 56
article thumbnail

Revit OpEd: Wall Floor Interaction and Linked Models

Revit OpEd

Wall Floor Interaction and Linked Models. When we have architecture and structure in separate Revit models we end up with somewhat clumsy graphics in wall sections. This is more pronounced if the structural slab is in the structure model only. The issue is the same when interior walls are linked into a shell model.

Revit 53
article thumbnail

A Day in the Life of a Green Building Attorney

Green Building Law Update

Client names and other specific references are omitted to protect the not so innocent.). Responding to consultant email and draft report of Phase II environmental site assessment. Responding to consultant with comments on selection of a DOE approved energy model for 179D tax deduction. 03:00 p.m.

Green 149
article thumbnail

Why Projects Fail

Job Order Contracting

Organizations that do not implement and continuously import upon a program-based approach, under which all projects a planned, procured, and executed, suffer from unclear objectives , shifting requirements , unrealistic schedule s, and reactive planning , Poor planning and poor change management impede individual project successes.

article thumbnail

Civil Engineering Software | List of Civil Engineering Software | List of Engineering Software

CivilJungle

Software Required for 3d Modeling of Structure/Architecture. Utilized in most structural design consultancies and firms. #1b. Primavera is a construction Planning and Scheduling software. #1e. AutoCAD Civil 3D is a design and documentation solution for Civil Engineering that supports Building Information Modeling (BIM). #3.