article thumbnail

Job Order Contracting – The Legal Side

Building Information Management

This is an example of Job Order Contracting from a legal perspective and that of a school district in Texas. This is NOT intended as ANY form of legal advice or counsel, but simply to share information relative to efficient construction project delivery methods. source: [link]. Magnolia ISD 170906. Gov’t Code 2269.401.

Legal 520
article thumbnail

Legal Documents Required for Purchase of Property

CivilJungle

Legal Documents Required for Purchase of Property. But we must avoid the problem and legal situation by checking the documents required for buying property. The below documents are necessary for the purchase of property: 1. Every construction work begins with legal approval. Land Property Documents.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

New Sustainable Projects Exhibit in 2017 AIA Contract Documents

Green Building Law Update

Last week the American Institute of Architects released the 2017 edition of the A201 family of contract documents, including updated versions of the AIA’s documents developed for the design-bid-build delivery model. The previous version of the design-bid-build contract documents included a Sustainable Project version.

article thumbnail

Five Tips for Maximizing Profitability With 3D Reality Capture

Construction Business Owner

Once the project is complete, you will have an accurate, objective progress record to eliminate doubt and minimize the risk of legal disputes, improving the likelihood of repeat business. Bryce Munn Field Applications Engineer FARO Technologies Bryce Munn is a Field Applications Engineer (FAE) at FARO Technologies.

article thumbnail

OSHA Alert: How to Prepare for an OSHA Inspection

FDR Safety

This can be accomplished by asking the OSHA inspector to wait for the arrival of the designated representative before starting the inspection. Where the inspector refuses to wait or where it is impossible for the representative to personally appear, designate a back-up to fill in.

OSHA 156
article thumbnail

Maryland Schools will No Longer be LEED Certified

Green Building Law Update

Green Building Council’s LEED (Leadership in Energy and Environmental Design) Green Building Rating System Silver rating or a comparable rating system or building code as authorized in Section 3-602.1 In fact, we gave our first legal opinion on a LEED certified public building in Maryland in 2002.

Maryland 240
article thumbnail

Mr. Ethics - July 2017

Mr Ethics

In accord with the bid documents all bids were to be evaluated on a point system. Another team was going to assess the aesthetic aspects of the proposed bid design. Should I seek legal action or advise the owner that its action is unethical? Dear Undecided, Only you and your counsel can determine whether to take legal action.

Bidding 100