Remove Document Remove Drawings Remove Inspections Remove Schedule
article thumbnail

JOC Procedures

Job Order Contracting

Contract Administrator notifies the Contractor of a Project, schedules a Joint Scope Meeting, and issues a Notice of Joint Scope Meeting. Any required documentation and/or forms. Owner regularly inspects the site. JOC PROCEDURES FOR ORDERING WORK . Initiation of a Job Order. Any associated subcontractor information.

article thumbnail

3 ways to avoid defects in construction

Lets Build

The success of any construction project relies on scheduling, costs, and the quality of the finished product. One of the major reasons that construction managers must schedule rework and fight against claims is defects. Design defects are a result of the design team failing to produce organised and accurate construction documents.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Integrated Project Delivery Software and Support Services

Job Order Contracting

Early and ongoing involvement of internal and external teams, inclusive of joint scope and schedule development Reliance upon local, on-site service delivery partners (AEs, builders…). Upload and share documents and make them available to your whole team – including PDF, Word and Excel files, images and videos. Common Data Environment.

Software 150
article thumbnail

Adopting a construction management software to improve productivity

Fieldwire

With Fieldwire, construction teams can easily and effectively manage tasks, plans, and documents, and ensure that projects are on track and completed successfully. Poor field-to-office communication : Fieldwire gives construction workers a centralized platform to communicate and share documents, report issues and give updates on progress.

article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

article thumbnail

Facilities Preventive Maintenance

Job Order Contracting

Manufacturer’s schedule for routine preventive maintenance, inspections, condition monitoring (predictive tests) and adjustments required to ensure proper and economical operation and to minimize repairs. Include recommended schedule for retesting and blank test forms. Installed model and features of each system.

Equipment 227
article thumbnail

Construction project management 101 – Checklist

Lets Build

Managing complex data in intersecting tasks and teams include confirming a project’s justification, developing project schedules and goals, maintaining commitments for a project, holding people accountable, and avoiding common project pitfalls. The PMP also archives baselines for scope, cost, and schedule. Performance and monitoring.