Three Easy Steps to Building a Commercial Building
Wolgast Corporation
DECEMBER 6, 2023
This preliminary phase includes a floorplan, exterior elevations (if applicable), code and zoning checks, and an initial engineering analysis.
This site uses cookies to improve your experience. By viewing our content, you are accepting the use of cookies. To help us insure we adhere to various privacy regulations, please select your country/region of residence. If you do not select a country we will assume you are from the United States. View our privacy policy and terms of use.
Wolgast Corporation
DECEMBER 6, 2023
This preliminary phase includes a floorplan, exterior elevations (if applicable), code and zoning checks, and an initial engineering analysis.
Construction Business Owner
JUNE 29, 2012
MANAGEMENT |. General Management. People Management. Equipment Management. « Better Project Management through Better Communication. Committing Intentional Project Communications » Public Exposure and Liability on Construction Sites. Committing Intentional Project Communications.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Construction Junkie
JULY 8, 2020
Former winners CONEXPO-CON/AGG Radio, The ConTechCrew, and The Lien Zone were back and all had strong showings in the voting round. Check out our full review of The Lien Zone by clicking or tapping here. #7: Check out our full review of The Construction Management Podcast by clicking or tapping here. #11:
HardHatChat
SEPTEMBER 22, 2009
How did you file the documents for your last commercial construction project? If so, you probably put those documents in a banker’s box or two and then stored them in your office. Or maybe you paid to have the documents stored in a warehouse. By moving to a paperless project management software system.
Construction Junkie
MAY 20, 2020
Former winners CONEXPO-CON/AGG Radio, The ConTechCrew, and The Lien Zone are back, as well as a many other podcasts that are new to the competition. vote for the lien zone. vote for the lien zone. vote for the construction management podcast. This year we have several familiar faces, as well many new podcasts.
The Constructor
AUGUST 10, 2012
5 Extreme Concrete in contact with or buried under aggressive sub-soil / ground water, surface of members in tidal zone, members in direct contact with liquid / solid aggressive chemicals. Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?
The Korte Company
NOVEMBER 10, 2023
When a project manager starts drafting an email, intelligent software suggests the words that finish a sentence — shaving down the time needed to finish the message. For example, we can integrate cameras through software like OpenSpace to document and track project progress. We tip our hard hats to that.
Stok
AUGUST 24, 2020
As LEED project facilitators, the team actively coordinated with the entire project team throughout design and construction to successfully complete a LEED campus application, resulting in three LEED Gold certifications thus far, including the Chase Center. What were some of the unique challenges you faced with this project?
The Constructor
NOVEMBER 16, 2011
The opportunities and constraints inherent to a site and the response to a program/design brief are analysed and documented in an overall site planning document that should accompany a development application. Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?
Autodesk Construction Cloud
FEBRUARY 1, 2022
Everything you need to know about construction quality and how to manage it. We’ll take a deep dive into all the ways you can ensure your next construction project excels in quality. Quality in construction means that projects are finished within the guidelines established by the Scope of Work. What Is Construction Quality?
The Constructor
NOVEMBER 5, 2011
Related posts: MAGNITUDE & INTENSITY OF EARTHQUAKE EARTHQUAKE GEOTECHNICAL ENGINEERING AND ITS PRACTICES-III-EARTHQUAKE DESTRUCTION How can it be in Seismic zone but not in earthquake zone or near earthquake fault? releases 1000 times more energy than the earthquake of magnitude of 6.2 and 32 times more than the magnitude of 7.2.
Construction Business Owner
MARCH 8, 2012
MANAGEMENT |. General Management. People Management. Equipment Management. The more complex answer is workers are being pushed and pressured on production to the point that workers get into a zone of “get it done regardless of safety.” Committing Intentional Project Communications. construction management.
Construction Cost Estimating
AUGUST 15, 2018
A knowledgeable project manager is liable for completing the construction work in scheduled time and he ensures that no major accidents take place on the project. Quality requirements should be concise and valid, so that all the project stakeholders can recognize the requirements for conformance.
HardHatChat
JUNE 15, 2010
Does your general contractor’s commercial construction management team make itself available after hours? Is it easy to find a status update on your new commercial construction project? And I was so thankful that I invited Lucky’s construction manager to my house for Thanksgiving dinner. we shifted into overdrive. Baldrick’s.
The Constructor
MARCH 18, 2012
MINIMISING THE RISK OF CORROSION: The quality and depth of concrete in the cover zone are all important in minimizing the risk of corrosion as shown in fig. Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?
DebunkTheBIM
APRIL 27, 2011
. * I will expand on this in a further post – don’t want to prejudice your challenge ** You can be following a “traditional” design-document-build method, cutting a D&B deal or having a managed process implemented by a project manager, if you are having anything built, give this challenge a go.
Construction Cost Estimating
JANUARY 19, 2011
Maxwell System Inc, a pioneer software company in takeoff and estimating , job cost accounting, and project management, just launched Maxwell Systems™ ProContractorMX™ version 2.5. The software can manage the complete project lifecycle , procurement, bids and proposals, financials, employees, payroll, equipment.
DebunkTheBIM
AUGUST 31, 2017
Sure, ‘milestones’ do get peppered in these documents but the KPI’s (oh, I despise this TLA too) are so vague that can be achieved with just about anything (or nothing). Again, I do not expect everyone to be able necessarily to do modelling, some would model, some would model and manipulate, coordinate and/or manage models.
Construction Cost Estimating
MAY 19, 2012
Sage, a trust worthy supplier of accounting and business management software , launched Sage 100 Contractor. Sage 100 Contractor contains more improved service management, vendor, reporting and other capacities to augment the effectiveness of the users. Construction Estimating Checklist: A New Era of Estimating Service. Blog Archive.
Construction Cost Estimating
APRIL 13, 2011
These technologies help contractors to create the cost estimates required to bid on projects in other regions more effectively. Among these technologies the most important are online plan rooms, bid management software, takeoff and estimating software, building information modeling (BIM), and cloud-based project management software.
The Constructor
MARCH 20, 2012
Since the main function of concrete in the cover zone is to protect the steel reinforcement from corrosion, cracks in floor slabs can generally be filled with a cement paste. Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?
Revit Beginners
MARCH 23, 2007
The Data Manager. Some people refer to these individuals as Data Managers or Data Leaders. In an Architectural Record article " Getting on Board with Building Information Modeling " Larry Flynn describes a Data Manager as someone "responsible for coordinating the various computer files and models that are integrated into a BIM."
Building Information Management
JULY 2, 2012
Accompanying the technical documentation are instructions for creating the HVACie files using commercial design software. That portion of HVACie content pertaining to managed assets is 100% compatible with the NBIS-US COBie standard. William East, Project Manager (CEERD-CF-N). Dr. East was the Project Manager.
Building Information Management
JULY 2, 2012
Accompanying the technical documentation are instructions for creating the HVACie files using commercial design software. That portion of HVACie content pertaining to managed assets is 100% compatible with the NBIS-US COBie standard. William East, Project Manager (CEERD-CF-N). Dr. East was the Project Manager.
Construction Cost Estimating
FEBRUARY 8, 2012
The event will focus on how to defend your construction project’s success with the help of key strategic risk management control and methodologies. Can control their projects within interdepartmental risk management standards to gain transparency with one another. The attendee will gain the following knowledge:-.
Construction Cost Estimating
JULY 30, 2011
C-BID’s online planroom assist you to store, organize and distribute your plans online from one easy to use centralized location with a bid-document library where significant bid information (project documentation, up-to-date bid information, drawings, specifications, and addenda ) can be accumulated. com, www.jobsite123.com,
Lets Build
JUNE 9, 2023
Construction is usually involving and delicate, with different teams like trade professionals, project managers, and subcontractors working together to deliver successful projects. Today, construction teams rely on Building Information Modeling (BIM) to create and manage information during the entire lifecycle of a project.
Construction Cost Estimating
FEBRUARY 21, 2012
Construction Project Management & accounting software plays a vital role for construction companies. Now-a-days industry-specific project management software plays an important role for expanding integrated project management modules to participate with the leading stand-alone project management systems.
Contractor Bookkeeping
JULY 27, 2012
BPM – Business Process Management for construction company owners to grow passive income streams. Business Failure - No meaningful financial and project management records in the calendar quarter preceding the failure. Business Process Management - Develop a construction business that generates passive income.
Building Information Management
JULY 20, 2012
Aside from the dimensions of the objects themselves we have further considered their relationship to other objects and zones of clearance. However, when assembled to make an accessible WC package, we have considered further dimensional information such as wheelchair turning circles, clearance zone and tolerances.
Construction Cost Estimating
FEBRUARY 22, 2012
A specification (often abbreviated as spec ) can be termed as a type of a technical standard to be referenced by a contract or procurement document. These will develop the expansive administrative and procedural conditions inscripted in the General and Supplementary Conditions documents. Blog Archive. ▼ 2012. (18). ► May.
Construction Cost Estimating
FEBRUARY 18, 2012
The software includes some excellent features like simple navigation and installation process, admirable help documentation etc. The software contains a huge built-in database that accumulates all of your project details on materials, parts, labor work units, estimates and bid information to produce assemblies. Downloadable link.
Autodesk Construction Cloud
JULY 28, 2022
Yet only a small segment of the city is zoned for high-rise buildings, and a massive 75% of buildable land in Toronto is zoned for low-rise development only. The shortage of zoned land has led to a dramatic increase in land value downtown. Investment. Dive Deeper Into Toronto’s Construction Boom.
Lets Build
JUNE 9, 2023
Construction is usually involving and delicate, with different teams like trade professionals, project managers, and subcontractors working together to deliver successful projects. Today, construction teams rely on Building Information Modeling (BIM) to create and manage information during the entire lifecycle of a project.
Construction Cost Estimating
NOVEMBER 16, 2011
Any construction trade can use this program and is well suited for General Contractors, Subcontractors and Project Managers. If you are a newbie in the estimating service zone then you should know about construction estimating checklist and how to organize them. Portable Document Format (PDF) Estimate Software.
Construction Cost Estimating
JULY 20, 2011
The Code and Guidelines delineate the responsibilities of clients, project managers, contractors , subcontractors, consultants, related entities, industrial associations and employers in the construction industry. It is a privately held non-profit association that manages and organizes the U.S. Accela Citizen Access.
Autodesk Construction Cloud
MAY 17, 2023
Whether you leverage Bridge or any of these five data workflows , Autodesk Construction Cloud makes data management and standardization easier for project teams. Let’s take a deep dive into insights on how data standardization can help you optimize the success of your projects. Who creates projects?
Construction Cost Estimating
FEBRUARY 16, 2012
Team members will get the ability to upload and distribute project files on the TeamLink Portal as well as drawings, CAD and BIM files and photographs. Building owner can easily download project documentation like as-built drawings and product manuals from the portal. Benefits :-. o Totally scalable. Blog Archive. ► May.
Construction Cost Estimating
OCTOBER 22, 2011
They work on diversified projects like office blocks, schools, hospitals, factories to bridges, railways, oil and mining development, shipbuilding and large process engineering works for example oil refineries. Necessary additions are counterbalance by identifying other savings. Blog Archive. ► 2012. (18). ► June. (4).
Construction Cost Estimating
FEBRUARY 15, 2012
The complete documentation, tutorials, and additional example building models are also available. If you are a newbie in the estimating service zone then you should know about construction estimating checklist and how to organize them. The software contains standard material and 3D object library. Posted by Rajib Dey. Blog Archive.
Business Facilities
DECEMBER 6, 2017
All have ready access to major transportation infrastructure, energy, water and zoning that meets the industry needs of advanced manufacturing, information technology and bioscience companies. A credentialed Iowa Certified Site has relevant site-related data and documentation accumulated and is designated as “development-ready.”.
Construction Cost Estimating
JUNE 18, 2011
Bar chart is nothing but a simple graphical method of scheduling activities in construction management to commune between management and employees about the accomplishment of the work on a given day. It exposes process bottlenecks, allowing the project manager to focus on those points responsible for slippage.
Fieldwire
AUGUST 16, 2023
If I am speaking to a bunch of seasoned construction managers, they look at me and say “no kidding.” I supplied materials and services to dozens of these projects, all over the U.S., However, each was unique owing to variables such as site conditions, lot size, zoning restrictions, and anticipated demand. This doesn’t work.
Autodesk Construction Cloud
NOVEMBER 16, 2021
Reports | Logo Management. Project Admins can now customize the logo that shows up on reports by either selecting the account logo or adding in a net new logo. Cost Management | Enhanced Document Review Functionality**. Cost Management | Expense Photo References. Cost Management | Expense Photo References.
Expert insights. Personalized for you.
We have resent the email to
Are you sure you want to cancel your subscriptions?
Let's personalize your content