Remove Documentation Remove Overhead Remove Profitability Remove Reference
article thumbnail

8 essential steps for effective project cost estimation and budgeting

Fieldwire

Subcontractors getting awarded a contract spells financial disaster if the bid is too high to be competitive or too low to be profitable. General contractors can review all available construction documents or the bill of quantities the property owner or project engineer prepared. On average, remodelers net 4.7% before taxes.

article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods, qualifications, assumptions, inclusions, and exclusions. Bill of quantities (BOQ) - a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. May also be called pricing.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Rory Woolseys Construction Estimating Blog. Thursday, May 31, 2012. Mark It Up!

article thumbnail

16 Things Every Contractor Should Know When Bidding a Job Order Contract

Job Order Contracting

The Owner simply references their existing Technical Specifications. it can be difficult for awarded JOC contractors to make a reasonable profit and can place undue pressure on the contractor. indicating “Per JOC Cooperative Contract”, on the appropriate document. Specifications should be provided for all work order requests.

Bidding 100
article thumbnail

6 Tips for Getting Paid Now – Not Later

PSMJ Resources

Refer to article 9 of AIA Document B101-2007 for guidance. Raises, benefits, and other overhead factors can easily strip away profits if not monitored and adjusted. Understand what your overhead factors are. Once the client has signed off, proceed to completing the documents in a most efficient manner.

article thumbnail

The Unique Challenges of Procurement Planning for Construction Companies

ProcurementExpress.com

Document management. What are the overhead costs? Profit margins in the construction industry are notoriously tight. Review—call references, research companies, and read reviews. As mentioned, construction teams risk losing out on profits when quality control isn’t given priority. Estimation tool. Tight Margins.