Remove Drafting Remove Drawings Remove Modeling Remove Presentations
article thumbnail

What to Look for in Construction Design Software

Lets Build

Construction design software is a necessity in today’s digital landscape, giving industry professionals an easier way to create blueprints and drawings of new designs. With construction design software, you can visualize different design possibilities, create professional presentations, better assess risks , and make more informed decisions.

Software 148
article thumbnail

Difference Between Sketching and Drawing | What Are Conceptual Sketches | Architecture Concept Drawing | Types of Drawings for Building Design

CivilJungle

it can also go into considerable depth, including design illustrations, indicative plans, sections and elevations and 3D Models of a development approach. ”. Architecture Concept Drawing. An architecture concept drawing is a technical drawing of a building (or building project) that falls within the definition of architecture.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Community, change and consistency: How to reach for the marketing future while respecting the present and past

Construction Marketing Ideas

An architect or engineer would not, for example, do well in 2016 with conventional drafting tables and pen-and-ink drawings. One observation helps frame these perspectives: The old stuff still works most of the time, as long as you recognize what needs to change, and you are ready to lead where change truly is necessary.

article thumbnail

Another example why it is better to stay out of BIM surveys…

DebunkTheBIM

It provides a credible picture of present day attitudes and progress made towards Building Information Modelling (BIM) in New Zealand.” In the executive summary, the first question is interesting, even more the way the results are presented. Note the words ‘on behalf’ and ‘credible’. Then, look at the chart itself!

BIM 54
article thumbnail

Severin Doctrine: It's Another Name for "Pass-Through-Plus" Claims

Best Practices Construction Law

United States , the plaintiff-contractor agreed with the defendant-federal government to build a post office in which plaster column models and ornamental work were to be supplied by the government. The subcontractor prepared an additional 70 shop drawings for total of 1,650 additional hours for which it sought additional compensation.

Claims 48
article thumbnail

BIM Objects, Data, and Information – More than a 3D Pretty Picture – Soooo Much More!

Building Information Management

Traditionally, a value that was represented on a drawing may not correctly corresponded with the value within the specification simply due to a ‘typo’ An example being where a ’60 minute fire door’ has been recorded on the drawing but has been recorded as ’90 minutes fire rating’ within the specification.

BIM 51
article thumbnail

Dennis Calvert, the right architect for Design-Build

The Korte Company

In grade school, Dennis’s art teacher noted his ability to draw and suggested he consider a career in art. The work was labor-intensive at the time—everything was hand-drawn on drafting boards—and everyone still wore white shirts and ties. His father worked as a carpenter and passed the trade down to his son. . “I

Design 52