Remove Drawings Remove Engineering Remove Overhead Remove Software
article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

As soon as the project is procured, estimate details flow automatically into Sage business management software, removing unnecessary tasks and data entry errors. Sage Estimating also facilitates forecasting the labor, raw material and other overhead costs so that the contractors can arrange & deliver correct bids.

Bidding 40
article thumbnail

Job Order Contract – Frequently Asked Questions

Job Order Contracting

Is JOC Software required? Required software, Unit Price Book, other “tools”, and training etc. While smaller JOCs can be managed in spreadsheets, a JOC-specific software package helps to assure the requisite levels of collaboration, transparency, productivity, and oversight. Should a UPB include overhead and profit?

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Comparison of Construction Cost Estimating Software Tools 2015

Building Information Management

Cost Estimating/Project Management Software – 4Clicks Project Estimator. While most construction cost estimators continue to rely primarily upon hardcopy documents and electronic spreadsheets, such as Microsoft Excel, many are beginning to leverage electronic cost books and associated calculator software tools.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Simplified Acquisition of Base Engineer Requirements (SABER) contracts provide a streamlined means to complete construction projects estimated at less than 750K. Contracting personnel and civil engineers are encouraged to adapt their SABER-like acquisitions and processes to meet their local needs and the local environment.

article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Architectural drawings. 5: Drawings. Construction documents often include architectural drawings. Overhead costs. Instead of having your data on disconnected engines or in multiple locations, consider leveraging a common data environment. Some common kinds of construction documents include: Bidding documents.

article thumbnail

What Is Estimate | Types of Estimate |Requirement Data for Estimation |Advantage of Estimate | Disadvantage of Estimate | Types of Cost Estimation

CivilJungle

Drawings (Plans, Sections, etc.). Drawings : Planning , sectional elevations, and accurate scale drawings are needed, completely dimensioned. Typically the plan, elevation and sectional elevations are drawn to a scale of 1cm = 1m and accurate drawings are planned for scales of 1cm = 10cm to 1cm = 29cm. Specifications.

article thumbnail

Types of Estimate found on various stages of a Project

Construction Cost Estimating

An estimator has to be very careful about the quantity takeoff using the given data such as drawings, specifications and other documents about the project. Direct Cost includes cost of materials, equipment, labor and subcontracted cost; while the Indirect cost includes overheads and contingency.