article thumbnail

Top 10 PVC Pipe Manufacturers in India

CivilJungle

Total income: 5633 Cr. ( Income: 824.01 Income: 604 Cr. Jain CPVC plumbing pipes and Fittings for Hot water application is one more item which will be a forward joining of the above gathering of foundation items. Income: 4560.8 Income: 453.4 This PVC pipe company is India’s best PVC pipe company.

Income 52
article thumbnail

3 affordable housing projects that serve as social catalysts

BD+C

Eleven million people in this country are paying more than half of their income for rent, and these are low-income people,” says Richard Burns, CEO of the NHP Foundation, a national not-for-profit provider of affordable housing. Affordable housing is housing built for people who earn 80% or less of the area median income (AMI).

Housing 111
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How To Prepare A Construction Plan

cnstrctr

The document is typically composed of the following: A narrative or written document outlining how the various components will be approached Drawings and illustrations indicating temporary construction and phasing Photographs and images A detailed or milestone construction schedule. Include a drawing of your site safety plan.

Plans 74
article thumbnail

Inside the Mind of the High-Performance Homebuyer

Pro Builder

68% have an annual household income over $100,000. 39% have annual household income over $100,000. 39% have annual household income over $100,000. 60% are allergic to dust and/or have pollen allergies, compared with just 15% of the general population, per the Asthma and Allergy Foundation of America.

Income 136
article thumbnail

M&V, MBCx, WTF: Building Performance Monitoring as a Means to Achieve Decarbonization Goals

Stok

In the built environment, quality assurance and control processes like measurement and verification (M&V) and monitoring-based commissioning (MBCx) require real-time, accurate data and provide insights that are foundational to achieving zero carbon targets. However, because of how the M&V credit has evolved from LEED version 2.0

article thumbnail

AEE WEST 2023: Building Performance Monitoring

Stok

In the built environment, quality assurance and control processes like measurement and verification (M&V) and monitoring-based commissioning (MBCx) require real-time, accurate data and provide insights that are foundational to achieving zero carbon targets. However, because of how the M&V credit has evolved from LEED version 2.0

article thumbnail

What Is Estimate | Types of Estimate |Requirement Data for Estimation |Advantage of Estimate | Disadvantage of Estimate | Types of Cost Estimation

CivilJungle

Drawings (Plans, Sections, etc.). Drawings : Planning , sectional elevations, and accurate scale drawings are needed, completely dimensioned. Typically the plan, elevation and sectional elevations are drawn to a scale of 1cm = 1m and accurate drawings are planned for scales of 1cm = 10cm to 1cm = 29cm. Specifications.