article thumbnail

High-Performance Custom Homes: Systemic Sustainability in Cape Cod

Pro Builder

High-Performance Custom Homes: Systemic Sustainability in Cape Cod. A bumped-out picture window and an offset destination screened porch linked via a balcony with wide stairs that lead to the ground floor all add layers of visual interest to the two-story rear exterior. Tue, 12/01/2020 - 10:52. Hutchins, LEED, AP. Photos: David Fell.

article thumbnail

Transforming the entry experience with biophilic design

BD+C

To counteract this impression, we implemented a series of design elements that not only added visual appeal but also bridged the gap between the interior and exterior spaces. Incorporating plants and a captivating water feature not only added visual interest but also created a soothing auditory experience.

Design 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM Dimensions 101: 3D, 4D, 5D,6D, 7D, 8D, & Beyond

Autodesk Construction Cloud

Think of it as the much more evolved version of the 2D drawing; while drawings consist of an X and Y-axis, 3D BIM adds another dimension: the Z-axis. Essentially, 3D BIM lets you create and visualize the building's design. Sustainability 6D BIM integrates environmental data into the model. What is 4D BIM?: What is 5D BIM?:

BIM 98
article thumbnail

Residential Siding: 5 Tips for Choosing the Right Material and Color

Construction Marketing

Be sure to draw inspiration for suitable siding material and color to install to transform your exterior from your property’s architecture and style. However, wood sidings require routine maintenance, including caulking and painting, to protect them from extreme weather conditions and sustain their appearance. Vinyl siding.

article thumbnail

The Complexity Of OSHA’s PSM Standard

FDR Safety

To help our clients that deal with PSM, we would draw your attention to the top 5 most cited standards from PSM NEP : Mechanical Integrity Process safety information PHA Operating procedures Management of change. Unfortunately, there are no clear-cut answers.

Risk 223
article thumbnail

BIM based visual estimation with Quantity takeoff Software

Construction Cost Estimating

Quantities that have already included the estimate are represented by a dollar sign, and all the cost items are verified visually in the estimate with colors in the 3D view at any point. One is able to mark up and round-trip comments with incorporated, redlining tools, and visually cross-reference individual objects and items.

article thumbnail

BIM based visual estimation with Quantity takeoff Software

Construction Cost Estimating

Quantities that have already included the estimate are represented by a $ sign, and all the cost items are verified visually in the estimate with colors in the 3D view at any point and keep away from over- or under-estimating. Quantity Takeoff Process ? Place the paper plans for digitization on the tablet.