Sat.Oct 19, 2013 - Fri.Oct 25, 2013

article thumbnail

Social Media For Construction – 2013 Survey Results

Construction Marketing

'To further understand the use of social media in the construction industry, the Construction Marketing Association conducted a national survey of construction professionals. The following questions were asked: 1. Do you employ social media in your marketing program? 2. If yes, do you manage social media marketing internally or outsource? 3. What social networks do you employ?

article thumbnail

Five Steps that Will Transform Your Business

Construction Business Owner

'Most owners of small- to mid-size construction companies are too busy micro-managing, ordering materials, scheduling crews and worrying about equipment to delegate important tasks to their foremen or superintendents. When owners stay in charge of making most decisions, their companies aren’t able to expand beyond what the owner can accomplish. As a contractor business coach, I have observed the strategies that enable companies to move to the next level.

Schedule 227
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

ADVERSE EFFECT OF CONCRETE ADMIXTURE

The Constructor

'Adverse effects due to improper application : Admixtures are used extensively to produce high workable, high strength high performance and highly.

Concrete 234
article thumbnail

Time for a look at 24-7 safety metrics

FDR Safety

'Our guest blogger today is Mike White, a senior advisor at FDRsafety and recently retired Global Safety Director for GM. I recently retired as GM’s Global Safety Director and I find myself reflecting upon the ongoing debate in ASSE and other professional forums regarding safety as a value. In 1994, GM’s top six operating officers created a policy making safety the “over-riding priority” of the corporation.

Safety 149
article thumbnail

Leading the Way in Construction EHS Software

The Verdantix Green Quadrant: EHS Software 2023 is an independent third-party analysis of 23 EHS software vendors (including Intelex) that provides an in-depth look at the technical capabilities, application breadth, innovation focus, and momentum of key environmental, health, and safety management software market players. The guide is essential reading for EHS software benchmarking, especially for understanding unique vendor strengths and capabilities.

article thumbnail

FTC To Ramp Up Enforcement of Environmental Claims

Green Building Law Update

'The Federal Trade Commission will begin to ramp up enforcement of deceptive environmental claims, according to Jessica Rich, director of the commission’s consumer protection bureau. “A growing number of consumers are looking to buy green products and companies respond with green marketing. But sometimes what companies think green claims mean and what consumers think they mean are two different things,” Rich said at the Advertising Self-Regulatory Council conference last month.

Claims 136

More Trending

article thumbnail

World's tallest twisting tower added to Dubai skyline [slideshow]

BD+C

'The SOM-designed Cayan (formerly Infinity) Tower —the world’s tallest twisting tower—has opened in Dubai, United Arab Emirates. The 75-story residential building features a dramatically rising helix shape for a distinctive addition to the city’s skyline. Body Image: read more.

article thumbnail

Terex trucks help Glasgow get ready

Digger Blog

'Malcolm Construction is working on a large regeneration project in the east end of Glasgow, hauling muck, and the job has proved a great proving ground for a pair of new locally-manufactured Terex TA300 articulated tipper trucks. Darren Gilmour, general manager at Malcolm Construction, says that while the muck is just being dispersed around the site to maintain a level, rather than being sent to landfill, trucks are used alongside excavators. “Where muck has to go distances in excess of 2

Budgeting 103
article thumbnail

Construction Sector Adds 20,000 Jobs in September

Construction Equipment

'Construction employment rose by 20,000 in September as the industry’s unemployment rate reached a six-year low of 5.8 percent, according to analysis of federal data by the Associated General Contractors of America (AGC). Additionally, construction spending increased for the fifth consecutive month in August. AGC officials note that the data does not address any potential impacts from the recent federal government shutdown.

AGC 78
article thumbnail

Case Study: Construction Permit Requirements

Construction Business Owner

'Keeping track of all the permit requirements for various projects in different jurisdictions can be difficult. Even if you are aware of all the details, you may face lengthy delays for permit reviews. A member of the Construction Business Owner LinkedIn group asked the following question: What can we do to manage compliance with all the permit requirements in our industry and delays for permit reviews?

Permits 120
article thumbnail

Optimize Operational Processes With an Industry-Specific ERP

As the use of Enterprise Resource Planning systems in the construction industry is critical to optimizing operations, it's critical that decision makers conduct a thorough software evaluation to find the one that best aligns to their needs.

article thumbnail

Architecture Billings Index hits seven-month high in September

BD+C

'Showing a steady increase in the demand for design services, the Architecture Billings Index (ABI) continues to accelerate, as it reached its second highest level of the year. The American Institute of Architects (AIA) reported the September ABI score was 54.3, up from a mark of 53.8 in August. This score reflects an increase in design services (any score above 50 indicates an increase in billings).

article thumbnail

No Slowing Down: Celebrating 5 Years with Extreme Team Building

Stok

'2013 marks the five year anniversary of Environmental Building Strategies. We’ve come a long way in 5 years, from our co-founders and principals Matt Macko and Ryan Potvin doubling up on a 50cc scooter to attend client meetings, to being ranked the 25th Fastest-Growing Company in the Bay Area by the San Francisco Business Times. […].

article thumbnail

Volvo CE Americas Headquarters Wins PEDA Award

Construction Equipment

'The Pennsylvania Economic Development Association (PEDA) has selected the new Americas headquarters of Volvo Construction Equipment as the recipient of the 2012 Project of the Year award. PEDA presented Volvo CE with the award during its annual awards lunch at its 2013 Fall Conference at the DoubleTree Hotel in Pittsburgh on Oct. 22. “One of the main reasons the Volvo CE project was selected as the Project of the Year was due to the company’s demonstrated job creation and retention efforts,” sa

America 70
article thumbnail

Electrical Workers Taking Deadly Safety Risks

Safety Services Company

'A recently released report from the Electrical Safety Authority (ESA) states that electricity-related deaths in Ontario declined 38 per cent the past five years. Despite the positive trend, the organization cautioned that too many Ontarians — especially electrical workers —are dying from electrical accidents. Electrical tradespeople accounted for 29% of all electrical-related fatalities in the workplace between 2003 and 2012, and they continue to be critically injured on the job when working on

article thumbnail

The Ultimate Procurement Software Buyer’s Guide

Choosing the right procurement software is a crucial step in ensuring third-party risk management, process governance, and bidding efficiency. With so many procurement solutions to choose from, it can be overwhelming without a frame of reference and a solid starting point. This free buyer’s guide will cover: Benefits of Procurement Software –– Why do you need it?

article thumbnail

Hoffmann Architects announces launch of U.S. Capitol Dome restoration

BD+C

'Hoffmann Architects, Inc., an architecture and engineering firm specializing in the rehabilitation of building exteriors, announces the start of a restoration project at the United States Capitol Dome, for which we are serving as architect of record. read more.

article thumbnail

Silver medal for British Rodeo team

Digger Blog

'The UK was represented by Ashley Goddard and James Binks, who took on 35 other plant operators from 13 countries across Europe in a series of four digger-related challenges at the Case Customer Centre at Monthyon near Paris. These included Bullseye (pictured above), using a CX210C with a hydraulic grab to pick up geometric figures and place them in designated supports.

Claims 63
article thumbnail

Volvo CE President Resigns

Construction Equipment

'Pat Olney, current president of Volvo Construction Equipment, will leave his position at the end of the year. Olney will move on to a non-competing, large engineering company based in the U.S. Olney, 44, joined Volvo CE in 1996 and held a number of top management positions in finance, operations and general management before becoming president of Volvo CE in May 2011.

Finance 64
article thumbnail

Autodesk WikiHelp is not a Wiki Anymore

Revit OpEd

'For the last month or so the Autodesk Revit documentation team has been transitioning to a new system for help documentation. When you click the help icon (?) on the Info Bar in Revit you''ll find a new format and different help web domain: help.autodesk.com. You probably are well aware that a couple years ago they changed things to focus on a wiki based format that moved product help resources to a web based approach instead of the past Windows based.CHM help file format.

article thumbnail

Stop Making These Mistakes and Start Scaling Your Specialty Contractor Business

Anything that is built on a poor foundation will soon crumble from the ground up. This is literally the case in the construction stage of projects and it applies just the same during the pre-construction stage. This free eBook is your ultimate guide to scaling your business with customizable software as early as during the bidding stage.

article thumbnail

Gehry, Foster join Battersea Power Station redevelopment

BD+C

'In what Frank Gehry described as "a neighborhood and a place for people to live that respects the iconic Battersea Power Station while connecting it into the broader fabric of the city," the famed architect and his peer, Norman Foster, are collaborating on a design scheme for a retail district for the £8 billion redevelopment of the Battersea Power Station in London. read more.

Retail 89
article thumbnail

Why BIM is Failing…. or What Starbucks Gets that Architects Don’t!

Building Information Management

'Reblogged from Christine Outram in What I Learned Building…. What Starbucks Gets that Architects Don’t. Or why I left the architecture profession. Dear architects, You’re outdated. I know this because I once was one of you. But now I’ve moved on. I moved on because despite your love of a great curve, and your experimentation with form, you don’t understand people.

BIM 59
article thumbnail

CORRECTION: Caterpillar 3Q Financials

Construction Equipment

'In an article posted earlier this week, Construction Equipment inaccurately described Caterpillar''s financial performance for the third quarter. A corrected version of the story appears here. The editors regret the error.

article thumbnail

#1 Fall Protection: Examining Top OSHA Violations of 2013

Safety Services Company

'For the second year in a row, the construction fall protection regulation, 1926.501, topped OSHA’s list of violations. It accounted for 8,241 of the 42,502 infractions in 2013. More importantly, according to the latest numbers released for occupational fatalities , “falls to lower level” was responsible for 12 percent of the deaths in 2012. Where employees are in danger of falling off ladders, platforms, elevated work surfaces or holes in floors and walls, it’s important for employers to take t

OSHA 55
article thumbnail

The Specialty Contractor's Guide to Job Cost Accounting

Supply chain challenges and rising material costs are forcing specialty contractors to pay more for what they need to complete each job. Following a simple set of principles, this easy-to-follow guide can help you manage job costs, ease the pains of accounting, and run a more profitable businesses. If you are a Specialty Contractor or Self-performing GC, you do not want to miss out on this essential guide!

article thumbnail

AIA: Crowd-funding shows promise for financing real estate projects

BD+C

'The Securities and Exchange Commission today voted 5-0 to propose rules aimed at letting startups tap large numbers of ordinary investors for small amounts of capital. Under the long-delayed "crowdfunding” regulations, small firms could sell shares through online "portals," where thousands of investors could pore over the business plans of small companies and choose promising investments. read more.

Finance 87
article thumbnail

How us little guys get the same leverage as big contractors

Contractor Magazine

'BY ED O'CONNELL. Shu-Bee, Trade Service, CONTRACTOR magazine. why do I recommend companies like these? Well, they''re icons you can trust, whose service is impeccable, and who provide you with leverage. read more.

article thumbnail

Manitou 3Q Sales Decrease

Construction Equipment

'Manitou Group’s third-quarter 2013 sales totaled €282 million, a 2 percent decrease from the same period in 2012. Cumulative nine-month sales totaled €873 million, a 9 percent decrease from September 2012. Despite the decline in sale revenues, order intake was up to 6,500 units from 6,300 in the third quarter of 2012.

64
article thumbnail

Attendance Up at GIE+EXPO, GIC 2013

Green Industry Professionals

'Dealer attendance up 6% at GIE+EXPO 2013, landscapers up 16%, and exhibit space is busting at the seams, show officials report.

70
article thumbnail

Report: Optimism for Construction Growth in the Next Year Remains High

Research reveals 96% of respondents are very or fairly optimistic about their organization’s growth prospects for the next year. The InEight Global Capital Projects Outlook also finds over half see digital technology as the greatest growth opportunity. But these are only some of the findings. Don't be kept in the dark when it comes to the future. Read the report today!

article thumbnail

D.C. office buildings going green at twice the national average

BD+C

'In 2011, about 33% of new office buildings in the U.S. were built to green standards, but in the nation’s capital that rate has skyrocketed. Since 2009, about 66% of the office space built in Washington, D.C., has been green. Incentives, a desire to reduce energy costs, and a movement to cut an organization''s environmental footprint are contributing to this trend. read more.

Green 83
article thumbnail

“There are NO” unwritten requirements – but fairness is in the eyes of the beholder

Construction Marketing Ideas

'PSMJ’s A/E Marketing Journal isn’t inexpensive — expect to pay $997 for a three-year subscription (and proportionally more for shorter subscriptions) but, in the scheme of things, it is a modest investment for practitioners serious about architectural/engineering marketing. You get for this money quality control and archives and some fundamental, solid advice.

Bidding 54
article thumbnail

Six Contractors Cited for Safety Violations at Berlin Power Plant Site

Construction Equipment

'OSHA has cited the general contractor and five subcontractors working on the construction of the Berlin Power Plant in Berlin, N.H., for 31 willful, serious and repeat violations. The employers face a combined total of $280,880 in proposed fines following inspections by OSHA’s Concord Area Office.