Remove 2004 Remove Consulting Remove Documentation Remove Management
article thumbnail

Behind the Build: Interview with Mostafa Saber, BIM & Design Manager at Diamond Developers

Autodesk Construction Cloud

We sat down with Mostafa Saber , BIM & Design Manager at Diamond Developers as he walked us through his career journey, the challenges he faces while modernising and his vision for the future of construction. I started my career as an architect in my home city, Cairo, Egypt in 2004. Check out our conversation below!

BIM 119
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., 2004; Black et al., management. Journal of Management in Engineering, 10(6), 26-29. management in the UK construction industry. Akintoye, A.,

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Projects Fail

Job Order Contracting

First and foremost is important to understand that all projects are exercises in managing change. The key to consistent delivery of successful projects therefore lies in the ability to account for and/or manage variations as they occur. As people naturally resist change, it is up to leadership to embrace and support change management.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management.

article thumbnail

How to Implement Construction Software in Your Business

Lets Build

In 2004 Loughborough University conducted a study entitled Technology Implementation Strategies for Construction Organisations. When a new project team is formed, running from Client, Consultants, Main Contractor and Subcontractors , it is quite possible that none of them have ever worked together before. Need for training.

Software 164
article thumbnail

Revit OpEd: Egress Path Options

Revit OpEd

In 2006 I demonstrated (at Autodesk University) the then new line based family type by explaining how we could use it to document egress path requirements also known as exiting plans. Defining the requirements for documenting exiting are naturally going to affect the success of any solution we try to provide. ► 2004. (2).

Revit 81
article thumbnail

Revit OpEd: Building Design Suite Installation Readme

Revit OpEd

If you are preparing for installing the 2013 Revit products via the Building Design Suites then you might want to start with the System Requirements PDF documents for each version. Comments: Comments are moderated to manage spamming. ► 2004. (2). ► December 2004. (1). ► November 2004. (1).

Revit 53