article thumbnail

Tommy Linstroth Automates LEED Efforts at Green Badger

Construction Business Owner

Tommy Linstroth Automates LEED Efforts at Green Badger ccapoccia Fri, 03/01/2024 - 18:33 Tommy Linstroth started his career in real estate development with a company that committed to sustainable building practices.

Green 194
article thumbnail

Lendlease Europe names new CEO

Construction Enquirer

Joining the company in 2005, Ruckstuhl has more than 25 years’ real estate experience – including more than 18 years with Lendlease. Lendlease has announced that the head of its Italy and Continental Europe business, Andrea Ruckstuhl, has become new CEO of its overall European operations.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Equation: Knowledge Problems + Data Problems + Management Problems = Outcome Problems

Job Order Contracting

In Advances in Life Cycle Engineering for Sustainable Manufacturing Businesses. Design to Life Cycle by Value-Oriented Life Cycle Costing. Kirkham, R. engineering the whole life cycle costing process. Construction Management and Economics. Luu Duc Thanh, Ng S. Thomas, & Chen Swee Eng.

article thumbnail

Lean methodology is ignored by the construction sector

Job Order Contracting

Bayfield & Roberts, 2005, Hook & Stehn, 2008, Howell, 1999, McGrath-Champ & Rosewarne, 2009). Lean Maturity, Lean Sustainability. Lean construction is not simply a matter of applying Lean manufacturing concepts. Alarcon (Ed.), Lean Construction (pp. Rotterdam, Netherlands: Balkema publishers. Barrett, P. CIB report.

article thumbnail

Launching a publication: 2005-style

Construction Marketing Ideas

The production costs can be sustained and the business can grow. That distribution can now be covered well enough electronically, of course.). In reviewing the Floridaconstructionnews.com title I’m satisfied we’ve produced a solid magazine with staying power. It’s fun to create new things.

Florida 48
article thumbnail

LEAN OpenJOC(TM) Job Order Contracting for Sustainable Facilities Repair, Renovation, and Minor New Construction

Job Order Contracting

US Army Sustainment Command. Contracts for November 8, 2005. The post LEAN OpenJOC(TM) Job Order Contracting for Sustainable Facilities Repair, Renovation, and Minor New Construction appeared first on 4BT. Federal Acquisition Regulation (FAR), Volume I, Subpart 16.5, Gransberg, D.D. 40 [link] Accessed June 24, 2013.

Contract 100
article thumbnail

Flummox: EPA Withdraws New Phase I Environmental Site Assessment Rule

Green Building Law Update

using the existing 2005 standard) Phase I assessment is a prerequisite to LEED for Schools certification and that 2005 standard is tied to credits in other LEED rating systems. The fix that some have suggested is simply to phase out 2005 Phase I and have it replaced with the 2013 version. the Superfund law).

Site 120