Remove 2009 Remove Design Remove Modeling Remove Office
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. Typical construction project stake holders include: Owners (management, engineering, contracting/procurement, building users), Contractors, Subcontractors, and Designers/Architects.

article thumbnail

Revit Beginners: Revit 2009 Rendering

Revit Beginners

Ive been teaching our office how to use Revit Architecture. This blog will highlight some of the common questions and cool tips found in the process of transitioning our office to Revit. Revit 2009 Rendering. Here is me doodling with Revits new rendering engine in 2009. How do you model the roof and ridge roll?

Revit 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

SMPS Foundation Announces 2009-2010 Board of Trustees

PSMJ Resources

The Foundation of the Society for Marketing Professional Services (SMPS) has announced its 2009–2010 Board of Trustees. The new board takes office on September 1, 2009. Foundation Board Officers (elected for a one-year term) are: President: Paula M. Fitzpatrick, FSMPS, CPSM, Principal, Marketivity, Inc.,

article thumbnail

Why Projects Fail

Job Order Contracting

There are several maturity models that describe the degree of maturity of an organization and/or associated projects. The various capability maturity models (CMM) can be applied to virtually any industry or market segment. 2006, Gibson, et al, 1994, Haley). These are helpful in determining current and future levels of progress.

article thumbnail

Enermodal HQ

SAB Magazine

In the design of Enermodal’s new headquarters, A Grander View, the primary goal was to create a LEED Platinum office that would be the most energy-efficient in Canada. Since its completion in late 2009, energy consumption for the 2150 m2 building is 69 kWh/m2 of energy per year.

article thumbnail

Construction Business Owner Blogs

Construction Business Owner

« World of Concrete 2012: Products Get Smarter, Interfaces Mimic Streamlined Design of Smart Phones and Tablets. This virtualization model just gives you the PC environment on a tablet computer, rather than optimizing the software for the tablet environment. Do you use tablets in your office or on the jobsite? August 2009.

Software 120
article thumbnail

Construction Business Owner Blogs

Construction Business Owner

While there are advantages to this type of so-called virtualization model, it is not a true browser-based or “Cloud” solution. </P. With this technology, management can access up-to-date business information anytime, anyplace and field staff can stay better connected to the office and to each other. December 2009. April 2009.