article thumbnail

USGBC Making Significant Change to LEED 2009

Green Building Law Update

Green Building Council has just announced that all new projects registering for LEED 2009 beginning on April 8, 2016 will need to satisfy increased minimum energy performance thresholds. 2007 (with errata but without addenda 25) using a computer simulation model for the whole building project.

article thumbnail

Will Proposed Change to LEED 2009 Kill the Goose that Laid the Golden Eggs?

Green Building Law Update

Green Building Council is soliciting comments on its proposal to change the prerequisites of the current LEED 2009 rating system increasing the minimum energy performance thresholds. That extension from June 27, 2015, the original date LEED 2009 registration was to close, was occasioned by the delay in LEED v4.

Green 120
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. “Despite the fact that these basic characteristics have been published and known for decades, we find that many agencies still lack the ability to develop cost estimates that can satisfy them”. –

article thumbnail

Preparing Independent Government Estimates – IGEs , IGCEs

Job Order Contracting

Most Independent Government Cost Estimates are Not Well Documented. The usefulness of an IGE to a contracting officer and other Government interest depends largely upon its supporting documentation. 2009) and Standards for Internal Control in the Federal Government, GAO-14-704G (Washington, D.C.:

article thumbnail

Is a BIM Mandate Coming to the US?

Viewpoint Construction Technology

As we discussed in a recent blog post , the JBKnowledge 2017 Construction Technology report found that building information modeling (BIM) adoption in the United States has been fairly slow, with only 27 percent of construction companies having a BIM department. Success stories like the LACCD indicate the potential of BIM adoption.

BIM 200
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., Conceptual model of partnering and alliancing. construction industry – A taxonomic approach to the literature of the 2000-2009 decade. Anvuur, A.

article thumbnail

Construction Business Owner Blogs

Construction Business Owner

The Business of Construction Risk Management » The Fundamentals of Building Information Modeling (BIM). Building Information Modeling (BIM) is no different. Until recently, those drawings were produced by hand, but in the last 25 years or so, computers have become the primary tool people use to produce construction documents.