Remove Accounting Remove Inspections Remove Permits Remove Presentations
article thumbnail

No Free Warranty: Connecticut Court Adopts Correction or Repair Test

Constructlaw

ALS’s subcontract permitted the DOT to hold back 60% of its payments to assure ALS would warranty the work, which ALS did with site checks performed between June 2019 and May 2020. This case presents important lessons for both subcontractors and developers, including: Claim forms matter, especially when submitted as sworn statements.

article thumbnail

Environmental Regulations in Construction: What Contractors Need to Know

Levelset

Environmental laws provide the backbone for permitting and reporting requirements on construction projects, while a wide variety of state and municipal laws impose even stricter rules. NPDES permits are issued by states that have obtained EPA approval to issue permits or by EPA Regions in states without such approval.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Project Foundation Pt. 2: Building the Master Budget

Stok

This includes the architect, design engineers, project manager, and all other consultants such as Acoustical, AV, IT, Structural, Food Service, Code, Permit Expediter, Graphics / Signage, Commissioning Agent, and so on. Check the architect’s contract to see if costs for presentation material are an added fee. Permitting allowance.

article thumbnail

Construction blueprints 101: What you need to know

Lets Build

These details are needed to request permits, determine the construction schedule , and eventually do the construction itself. The blueprints presented as negative drawings or illustrations of the original as white lines on a blue background. Every construction worker needs to know how to read blueprints.

Drawings 139
article thumbnail

Process Safety Management

Safety Services Company

Look for documentation of each inspection and test performed on process equipment. Records must include test date, the inspector’s name, a description of the activity and the inspection results. Hot-Work Permit. A hot-work permit is required for hot-work operations conducted on or near a covered process. SDS Guidelines.

Safety 48
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The Contractor must take these costs into account when proposing the. 3) A worker with overall project supervisory authority is to be present on each job site at all times. The ORGANIZATION NAME reserves the right to inspect such off-site work at any time. (6) authorization. coefficient (reference table of allowable overhead).

Contract 100
article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

THE ESTIMATING PROCESS FROM A TO Z Here in this cover story we are going to present you the basic details of the estimation. As you undergo the Worksheet, it’s vital to thoroughly take into account each item and either allocate it a price or mark it atomic number 11 (not applicable) if it doesn''t relate to your job. Building Permit 3.