article thumbnail

Enhance Your Mobile Tech Strategy with the ACC App (Previously PlanGrid Build) 

Autodesk Construction Cloud

Meanwhile, the Asian Development Bank (ADB) estimates that around $1.7 Track progress without leaving the field With the Assets tool in Autodesk Build, you can visually markup sheets and track asset progress on mobile. Across the pond, the UK is expected to spend £650 billion on social and infrastructure in the next decade.

article thumbnail

Don’t underload Tier 4 generators — it leads to wet stacking and engine failure

CK Power

You can visually detect it by looking for thick, black liquid in the exhaust pipe. A note on load banking. But auxiliary load banking, as well as regular load bank testing , can serve to prevent wet stacking and treat the beginning stages of it. Automatic auxiliary load banking is used in prime power applications.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Behind the Build: Interview with Mike White, Director of Design and Construction at North Point Hospitality

Autodesk Construction Cloud

When you're inputting cost data, plan data, or change data into the system, it lets you visualize where the project is at any given point. Regarding document management, we've been doing that for a while with PlanGrid and now Autodesk Build. The Cost Module in Build gives us better insight into real-time cost data.

Design 80
article thumbnail

Pulse: 08/20/2012

ENR Construction

Banking & Credit Crisis. --> Companies. Georgia Georgia State University has selected Heery International to provide interior design and engineering services for the first phase of the adaptive reuse of the former SunTrust Bank headquarters building in downtown Atlanta. Gulf Oil Spill. -->. Building Types. Construction Methods.

article thumbnail

Five Benefits of Inspection Reporting Software

Lets Build

You can also upload images, creating inarguable date-stamped visual records of condition and status. Photos aren’t subjective, either: While one inspector might describe and prioritise a known issue very differently from the next, a bank of date-stamped photographs provides unambiguous evidence.

article thumbnail

“Outcome-based Pathway” – The New Mandate for Energy Compliance?

Building Information Management

EUIr = the Reference Annual Energy Use Index for the building use and occupancy in Table 60X.1 1 as adjusted by Section 60X.1.3 where applicable TABLE 60X.1 compliant and be issued a violation. federal departments/agencies, as well as state/county/local governments, colleges/universities, healthcare, and airports/transportation.

article thumbnail

BIM-in-The-Cloud Has New Competition With Newforma | ENR.

ENR Construction

Banking & Credit Crisis. --> Companies. Plus, users can search for information in models with the integration of visual context "linked directly to Newforma PIM data," Batcheler adds. Gulf Oil Spill. -->. Building Types. Construction Methods. Sustainability. Haiti Reconstruction. Economic Stimulus. -->. Safety & Health.

BIM 65