article thumbnail

Three Easy Steps to Building a Commercial Building

Wolgast Corporation

This preliminary phase includes a floorplan, exterior elevations (if applicable), code and zoning checks, and an initial engineering analysis. During this step/phase, the final drawings, selection of your construction team, a confirmed maximum budget, and confirmed schedule are finalized to be construction ready.

article thumbnail

Civil Engineering Software | List of Civil Engineering Software | List of Engineering Software

CivilJungle

Introduction of Civil Engineer Software: There is multifarious software accessible which are utilized in Civil Engineering. The Civil Engineering Softwares are surging manifold day by day. Here could be a list of SOFTWARE which are outrageously employed by many Civil Engineers all round the world. Primavera P6-.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Visual Building - Editing roof wood construction

Construction Cost Estimating

This tutorial video demonstrates how in Visual Building you can examine and edit the wood construction components within the roof. This video is applicable to: Visual Building Lite, Visual Building Basic, Visual Building Professional, Visual Building Premium and Visual Building Solar Designer.

article thumbnail

Over 275 Partners Now Integrate with Autodesk Construction Applications 

Autodesk Construction Cloud

Latest Integrations for Autodesk Aiprentice's Artifact is a powerful search engine that allows teams to find relevant files, views, assets, and metadta from their completed and ongoing projects. Now, project managers can visualize 3D models generated in Metaroom directly into Autodesk Build Insights or BIM 360 Project Home dashboards.

Autodesk 118
article thumbnail

The Architecture Wall of Over-Budget Shame

BD+C

As if that’s not a lot already, many famous projects go over budget, often more than a whopping 200 percent increase (The Montreal Olympic Stadium was 1,990 percent over budget!).

article thumbnail

Best Value Facilities Repair, Renovation Work Order Delivery

Job Order Contracting

An integrated planning, procurement, and project delivery solution that drives consistent on-time, on-budget, quality outcomes at a fair price. All parties can visualize project and work order requirements at a granular level and drive efficient life-cycle management. Collaborative design for constructibility.

article thumbnail

LEAN Facilities Management Processes

Job Order Contracting

The role of LEAN Construction Delivery (through its key players: architects, engineers, surveyors, builders, managers, owners) is to support communication and cooperation, and drive optimal project outcomes on a consistent based using a robust, core programmatic process. The latter has been neglected.