Remove Consulting Remove Documentation Remove Modeling Remove Reference
article thumbnail

Behind the Build: Interview with Noyan Uras, Founder & CEO at Integrare Group

Autodesk Construction Cloud

When we say holistic, it’s in reference to the consideration that we place on the entire value chain and everyone involved in this complex building environment. There is never enough time for designers to create a complete, well-coordinated set of documents that developers and builders can rely on.

article thumbnail

Job Order Contracting Program Implementation Strategy

Job Order Contracting

Remember that a Job Order Contract can be designed, implemented, and managed by the Owner, a combination of an Owner and a JOC Consultant, or JOC task orders can be executed leveraging a Cooperatives. Technical Specifications to be reference. Job Order Contract Documents. Contact multiple JOC consultants and vendors.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The future of specifiers: The way forward

Construction Specifier

Will the role grow and change in the future or will it disappear completely in favor of a new model? They see trends toward integrating information better, both with building information modeling (BIM) and drawings, and between teammates. How can we encourage other professionals to take an interest in the role?

CSI 97
article thumbnail

Civil Engineering Software | List of Civil Engineering Software | List of Engineering Software

CivilJungle

This software can help in drafting & documenting, designing, visualizing & analyzing & so on. Software Required for 3d Modeling of Structure/Architecture. Utilized in most structural design consultancies and firms. #1b. Software Required for Drafting or Drawing. Primavera P6. Microsoft Project (MS Project).

article thumbnail

Why Projects Fail

Job Order Contracting

Throughout the ongoing process, however, all of the following are address and/or improved upon: Who can offer change ideas (informally and formally) Who assesses the impact of the proposed change Who reviews the proposed change and its impact for approval How is the change implemented Documentation of the outcome. CHANGE MANAGEMENT.

article thumbnail

Let’s be pedantic: Calling it ‘2D design’ is insulting!

DebunkTheBIM

Something specially bothers me in what they are doing to AEC: They constantly refer to ‘2D design’. I’ve also read workflow described as: ‘the model will be developed based on the consultants’ 2D design.’ Outputs may be 2D and should be referred to as ‘design documented using 2D projections’ (or similar).

Design 48
article thumbnail

BIM Pioneers: From 2D to 3D with Rodio Swissboring

Autodesk Construction Cloud

Without a central repository for all project information, key data like calculations, design plans and documents were stored on individual computers, making it difficult for collaborators to share easily and access information. There is no confusion over whether a document is a ‘work in progress’ file or a complete file.

BIM 52