BALANCED CANTILEVER METHOD OF BRIDGE CONSTRUCTION
The Constructor
JANUARY 17, 2012
The complete pier segment is then used as an erection platform and launching base for all subsequent travelling formwork and concrete segment construction. Special formwork is positioned and cast-in-situ pier segment is begun. Cast-in-situ segments range between 3mm to 5m in length with formwork moving in tandem with each segment.