article thumbnail

The Myth Of Zero Energy And Its Adverse Impact On Prevention Through Design

FDR Safety

THIS ARTICLE IS FOCUSED ON prevention through design (PTD) and why use of the term “zero energy” lockout/tagout (LOTO) for all service and maintenance tasks creates a range of adverse impacts. Examples of such impacts are: •impeding efficient and effective equipment designs when tasks (e.g., Download the full article here.

Design 156
article thumbnail

Construction Cost Estimating – Single Source of Truth

Job Order Contracting

Any owner, designer, builder who is not observing this fact has limited cost visibility and is likely to be “off” by 30%-40% or more. References: GAO-19-57 – FEDERAL REAL PROPERTY ASSET MANAGEMENT Agencies Could Benefit from Additional Information on Leading Practices.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Risk Management: How to Reduce Top Construction Risks

Autodesk Construction Cloud

How to Manage Risk in Your Construction Project. According to The Construction Industry Institute , there are about 107 construction risks you should consider when managing a project. Before you start panicking about the 90 plus risks on the list you’re probably not completely aware of at this moment, let’s take a step back.

Risk 59
article thumbnail

How to Achieve Acceptable Risk with TaBRA

FDR Safety

In past years I’ve written about the value of the ANSI B11 standards and risk assessment. Key to learning how risk assessment and feasible risk reduction work together is to undergo experiential learning. Key to learning how risk assessment and feasible risk reduction work together is to undergo experiential learning.

Risk 120
article thumbnail

Public Procurement of Construction Services

Job Order Contracting

References: AIA (2007). References: AIA (2007). Collaboration, Integrated Information and the Project Lifecycle in Building Design, Construction and Operation.” Integrated Project Delivery: A Guide.” The American Institute of Architects (AIA), Washington, DC AGC (2010). Integrated Project Delivery for Public and Private Owners.

article thumbnail

Exploring how sound and noise impact well-being in office design

Construction Specifier

Other potential consequences may involve tinnitus, characterized by ringing or other “phantom noises” in the ears, and hyperacusis, which refers to the increased sensitivity to ordinary sounds. The post Exploring how sound and noise impact well-being in office design appeared first on Construction Specifier. 2 In the U.S.,

Office 62
article thumbnail

Emerging issues in safety: Risk assessment, sustainability

FDR Safety

The first is risk assessment. In the mid-‘90s, when I was part of the National Safety Council’s Institute for Safety through Design (now “sunset”), risk assessment was more of a concept and vision than a reality for most organizations in the U.S. The other issue that is gestating more slowly is sustainability.