article thumbnail

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection

BD+C

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection 0 dbarista Mon, 11/27/2023 - 15:08 Engineers Private businesses and governments can now choose their new electric vehicle (EV) charger locations with data-driven precision. TREDLite EV makes a science out of site selection.”

article thumbnail

Implementing an ‘asset drawdown strategy’ for site decarbonization

BD+C

Implementing an ‘asset drawdown strategy’ for site decarbonization Solidifying a decarbonization plan via an “asset drawdown strategy” that carefully considers both capital and operating costs represents a game-changing opportunity for existing properties to compete with new projects. Illinois electricity generation by sources, January 2023.

Site 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Net Zero Carbon: A Quick Plug for All-Electric Buildings

Stok

An important step towards eliminating operational carbon is for buildings to go all-electric. All-electric buildings help reduce carbon emissions in three major ways: 1. By carefully selecting appropriate strategies, all-electric buildings on a wide scale can be cost effective in the long-term while mitigating climate change.

article thumbnail

Develop a Commercial site with BRIKS Design-Build Group

BRIKS Design-Build Group

Develop a Commercial site with BRIKS Design-Build Group. Nowadays building commercial sites can be a tough and complicated process as it includes a lot of federal permissions and zonal documents. Furthermore, detailed building plans combines with electric water supply permits are to be submitted to your local designated authorities.

article thumbnail

2024 International Energy Conservation Code Will Use a New Development Process

Pro Builder

The ICC Board also added that changes must be “technologically feasible, and life cycle cost effective, considering economic feasibility, including potential costs and savings for consumers and building owners, and return on investment.”. Requiring on-site solar panels. Requiring homes to be solar-ready and energy-storage-ready.

NAHB 98
article thumbnail

The Winning Homes in the Solar Decathlon Are …

Pro Builder

Evaluated for 10 different metrics, including energy efficiency, architectural design, innovation, and market potential, the homes had to be as technically impressive as they were feasible to build.

Income 52
article thumbnail

SPECIAL REPORT: Site Location Factors For Automotive Suppliers

Buisness Facilities Contributed Content

Anticipating increased supplier site locations, it is important for supplier executives to implement site searches that consider key location factors that generate locations optimizing operational and financial success. All of these indications of expanded OEM production point to increased site location activity for suppliers.

Site 60