article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Structures with weight restrictions. After a major incident.

article thumbnail

Derailment inquiry exposes risk management shortfalls

Construction Law

What has emerged so far reveals a systemic failure in the risk management and inspection procedures that underpin the maintenance regime of our ageing railway infrastructure, at least on that part of the railway network, but probably UK wide. So part of the drainage system had not been inspected at all since 2012.

Risk 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How To Set Up Solar Panels In A Commercial Building

Construction Marketing

Therefore, it’s equally crucial to inspect your roof so you can decide where to put the solar panels. The right racking system can be selected by design engineers, guaranteeing that the modules are securely fastened without harming your roof. . Review The Engineer’s Plan. Schedule A Final Inspection.

article thumbnail

Twists and Turbines — A New York Case Highlights an Owner’s Risk When Not Using Full-Wrap EPC Delivery

Constructlaw

the designer), the Kadney Company (the general contractor), Vergnet (the turbine supplier), and two different site engineers: Prudent Engineering, and Ravi Engineering and Land Surveying (the engineers). Two of the most notable risks are scope gaps, and as demonstrated in this case, liability gaps.

article thumbnail

Recall: Ram Trucks Recalled for Fire Risk

Construction Equipment

Fiat Chrysler announced Tuesday it is recalling 494,000 Ram heavy-duty pickups and medium-duty trucks to inspect and replace, if necessary, their water pumps. liter engines. The models involved are: Ram 2500 and 3500 pickups and Ram 3500, 4500 and 5500 chassis cabs from the 2013 to 2017 model years.

Risk 86
article thumbnail

Leverage Machine Learning to Reduce Risk with Construction IQ

Autodesk Construction Cloud

Even TradeTapp ingests data to compare subcontractor risk levels and proactively mitigate against project risk. We spoke with Michael Murphy, Digital Construction Operations Manager at BAM Ireland, to understand how Construction IQ is helping to drive safer, higher-quality projects for its teams with less risk.

Risk 52
article thumbnail

JOC Program Line-item Estimating

Job Order Contracting

Cost management involves different risks for all the parties involved, which highlights the need to manage risks properly. inspecting 100 percent of labor, materials, and equipment used) as well as the coefficient/adjustment factor used, and the type, number, and cost of non-prepriced line-items. Engineering News-Record (ENR).