Remove 2007 Remove Consulting Remove Management Remove Schedule
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Shorter construction schedules than planned. management. Journal of Management in Engineering, 10(6), 26-29. management in the UK construction industry. Management, 6(3), 159-168. International Journal of Project Management, 25(4), 386-393. Journal of Construction Engineering and Management, 133(3), 225-234.

article thumbnail

Why Projects Fail

Job Order Contracting

First and foremost is important to understand that all projects are exercises in managing change. The key to consistent delivery of successful projects therefore lies in the ability to account for and/or manage variations as they occur. As people naturally resist change, it is up to leadership to embrace and support change management.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. How about instead having a Rooms explorer, like you can explore Schedules, Sheets and Families? Whadya think?

Revit 56
article thumbnail

Revit OpEd: Panel Schedule and Load Calculation Addition

Revit OpEd

Panel Schedule and Load Calculation Addition. Comments: Comments are moderated to manage spamming. Panel Schedule and Load Calculation Addition. ► 2007. (77). ► December 2007. (1). ► November 2007. (7). ► October 2007. (5). ► September 2007. (4). Revit OpEd.

Revit 53
article thumbnail

PSMJ Resources Blog: Do Small Projects Need Schedules?

PSMJ Resources

Do Small Projects Need Schedules? Is it really critical that small projects have a schedule? Here are some of the most important reasons that schedules are developed: 1) First and foremost, you always want to get the work done on time. Without a schedule, it gets done when it gets done. Scarlett Consulting.

article thumbnail

Are Your Hotel General Contractors Checked In or Out?

HardHatChat

According to PFK Consulting, RevPAR, or, revenue per room available, will increase in the 50 U.S. hotels so far this year have performed as well as they did in early 2007, posting an average occupancy rate of 57.7 That’s why scheduling and staging work is so vital to a hospitality construction budget and timeline.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management.