article thumbnail

CSI Masterformat 2010 Sample Cost Codes

Cassell Construction Estimating

For any General Contractor contemplating revising its cost codes, we strongly recommend using the 2004/2010 Masterformat, (50 Divisions), rather than the tried and true 1995 Masterformat (16 Divisions). We’re sharing a more generic list of 2010 Masterformat Sample Cost Codes here, as a guideline for mid & smaller GC’s.

CSI 130
article thumbnail

Public Procurement of Construction Services

Job Order Contracting

Public procurement of construction services could be improved through the adoption of currently available best management practices. How Organizational integration and alignment of cultural, professional, management, and commercial interests is also required, both internally and with construction services providers. Ballard, G.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

CONSTRUCTION PROJECT FAILURE FACTORS

Job Order Contracting

4 Failure to leverage granular construction-based line of granular tasks and associated labor, material, equipment, and productivity information Inconsistency in planning and scope management, poor communication, and failure to address stakeholder engagement can be rectified. . #4 International Journal of Project Management Chitkara, K.

article thumbnail

Retail Construction Trends 2010 Update: Outside the Big Box

HardHatChat

It’s time to revisit another prediction I made last year in my blog post Commercial Constructions Trends to Watch in 2010 — Outside the Big Box. So far, I’ve given myself a B and an “incomplete” in revisiting two of my five commercial construction trends for 2010. This is looking eerily similar to my grade school report card.

Retail 209
article thumbnail

Facilities Management Key Performance Indicators

Job Order Contracting

List of Facilities Management Key Performance Indicators / Metrics: (1) Thermal comfort (e.g. 2001; Electrical & Mechanical Services Department, 2007; Electrical & Mechanical Services Department and Environmental Protection Department, 2010; Hinks and McNay, 1999; Ho et al., 2010; Leung et al., 2010; Leung et al.,

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

management. Journal of Management in Engineering, 10(6), 26-29. management in the UK construction industry. Management, 6(3), 159-168. International Journal of Project Management, 25(4), 386-393. Journal of Construction Engineering and Management, 133(3), 225-234. Management Institute. Akintoye, A.,

article thumbnail

Integrated Construction Planning, Procurement, and Project Delivery Solution

Job Order Contracting

The ultimate benefit provided by integrated construction planning, procurement, and project delivery solution is significantly improved life-cycle total cost of ownership asset management. Engineering, Construction and Architectural Management, 26(1), 104–. Construction Management at Risk in Health Care Projects. Team Selection.