Remove Concrete Remove Documentation Remove Drawings Remove Schedule
article thumbnail

New Asset Features to Boost Progress Tracking on 2D Drawings

Autodesk Construction Cloud

While project schedules are helpful, they’re often static and don’t contain real-time info on a project. With these new capabilities, you can visually markup 2D sheets and track asset progress to keep office teams updated while empowering folks in the field to forecast their productivity and quickly adjust to scheduling changes.

article thumbnail

New Asset Features to Boost Progress Tracking on 2D Drawings

Autodesk Construction Cloud

While project schedules are helpful, they’re often static and don’t contain real-time info on a project. With these new capabilities, you can visually markup 2D sheets and track asset progress to keep office teams updated while empowering folks in the field to forecast their productivity and quickly adjust to scheduling changes.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Classes for Field Teams at AU 2023

Autodesk Construction Cloud

Typically, a team might track installations by highlighting a drawing in Bluebeam, entering numbers into a spreadsheet every day in the project office, or even using colored pencils on a hard-copy drawing. Come and see Baker Concrete Construction, Inc.

Autodesk 102
article thumbnail

REINFORCEMENT COVER AND PRE-CONCRETE CHECKS

The Constructor

When the formwork is erected the concrete can be poured. When the concrete has reached the required strength the formwork can be poured. If the steel had been placed too close to the surface and the concrete had been poured then over time the steel may become exposed to moisture and corrosion will commence.

Concrete 250
article thumbnail

Bar Bending Schedule For Floor Slabs

Construction Cost Estimating

Bar bending schedule is an important structural working document that rightly gives the disposition, bending shape, total length, and quantity of all the reinforcements that have been provided in a structural drawing. It is often provided in a separate sheet (usually A4 paper) from the structural drawing.

article thumbnail

PRE-CONCRETE CHECKS FOR FORMWORK & RELEASE AGENTS

The Constructor

Formwork pressures are function of height (including the height from which concrete is dropped into the forms) and are affected by concrete workability, rate of stiffening and rate of placing. Exceeding this limit may lead to unacceptable formwork deflections, loss of grout / concrete at joints, or even collapse.

Concrete 235
article thumbnail

What’s the difference between RFIs, Submittals and Specifications?

Fieldwire

In construction, a Request For Information (RFI) seeks the clarification of plans, drawings, specifications, and agreements. The construction RFI is a formal written process in which parties, such as the contractor and designer, clarify information gaps in construction documents.