New Asset Features to Boost Progress Tracking on 2D Drawings

Autodesk Construction Cloud

With these new capabilities, you can visually markup 2D sheets and track asset progress to keep office teams updated while empowering folks in the field to forecast their productivity and quickly adjust to scheduling changes. Multiple assets can also be made quickly when drawing on a sheet.

article thumbnail

How to Study Civil Engineering Drawings

Construction Cost Estimating

The first step in any construction project is to prepare a visual plan for the building. This is called the drawing, a visual representation of the project with dimensions and appropriations so that civil engineers can understand what the architect actually wants them to build.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

New Asset Features to Boost Progress Tracking on 2D Drawings

Autodesk Construction Cloud

With these new capabilities, you can visually markup 2D sheets and track asset progress to keep office teams updated while empowering folks in the field to forecast their productivity and quickly adjust to scheduling changes. Multiple assets can also be made quickly when drawing on a sheet.

article thumbnail

REINFORCEMENT COVER AND PRE-CONCRETE CHECKS

The Constructor

When the formwork is erected the concrete can be poured. When the concrete has reached the required strength the formwork can be poured. If the steel had been placed too close to the surface and the concrete had been poured then over time the steel may become exposed to moisture and corrosion will commence.

Concrete 250
article thumbnail

Classes for Field Teams at AU 2023

Autodesk Construction Cloud

Typically, a team might track installations by highlighting a drawing in Bluebeam, entering numbers into a spreadsheet every day in the project office, or even using colored pencils on a hard-copy drawing. Come and see Baker Concrete Construction, Inc. CS601614 | Where's the Issue?

Autodesk 102
article thumbnail

How to Do a Takeoff in Construction: A Step-by-Step Guide   

Autodesk Construction Cloud

They also draw from their experiences from previous successfully completed projects to identify savings. In many cases, estimators refer to the project plans, models, and documents, then begin creating the list of materials from there. . Description: 6″ concrete slab on third floor . QTY: 1000 . UNIT PRICE: $xx .

article thumbnail

What’s the difference between RFIs, Submittals and Specifications?

Fieldwire

In construction, a Request For Information (RFI) seeks the clarification of plans, drawings, specifications, and agreements. The construction RFI is a formal written process in which parties, such as the contractor and designer, clarify information gaps in construction documents.