article thumbnail

Ashe seals £24m Milton Keynes school deal

Construction Enquirer

Ashe Construction has been awarded a £24m design and build contract to for a new primary school and community health hub for Milton Keynes Council. Ashe has been employed to manage the complete design and build contract and has developed the scheme from feasibility over a 15-month period.

Deals 84
article thumbnail

Level Up Design and Coordination Workflows with Accessible Reality Capture 

Autodesk Construction Cloud

For starters, you’re dealing with an old structure without CAD files and limited documentation. Needless to say, trying to design, coordinate, and build in and around these conditions is an uphill battle. A better design and coordination workflow . Let’s go back to that project… .

Design 119
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ANSI B11 and risk assessment: The best kept secret in safety

FDR Safety

national standards dealing with the safety requirements for general industry machines. At the recent ASSE Professional Development Conference, there was considerable focus on risk assessment, voluntary standards and prevention through design. Remember that the goal of risk assessment is to achieve feasible risk reduction.

Risk 120
article thumbnail

Develop a Commercial site with BRIKS Design-Build Group

BRIKS Design-Build Group

Develop a Commercial site with BRIKS Design-Build Group. In addition to this commercial buildings have an annual or bi-annual inspection by designated local authorities which makes sure that the building abides to all safety standards. BRIKS design-build group has one of the best crew which handles the related issues for you.

article thumbnail

Vital factors to impact the design and construction of embankment dams

Construction Cost Estimating

Numerous factors provide significant effect on the construction and design of embankment dam. Through the design phase, the designer should consider these factors to make the design better. Feasible wave action i. It will significantly impact the design of embankment dam. Properties of embankment dam site c.

Design 40
article thumbnail

FEATURE STORY: 2013 Economic Development Deal of the Year Awards

Buisness Facilities Contributed Content

billion project that has earned our 2013 Economic Development Deal of the Year Gold Award. “Our Deal of the Year Gold Award winner is a game-changer for Apple and Arizona,” said Business Facilities Editor in Chief Jack Rogers. manufacturing.” manufacturing.” Project Impact Estimates.

Deals 107
article thumbnail

Can metal lathes be made safe?

FDR Safety

Innovations in safeguarding can often be incorporated when designing and building new machines. Those same innovations are often not feasible for retrofit – that’s the reason for my passion around the concepts of “Design-in Safety” and “Prevention thru Design” (PtD). Back to lathes.