Remove Design Remove Environment Remove Schedule Remove US
article thumbnail

4 ways designers can help chief heat officers reduce climate change risks

BD+C

4 ways designers can help chief heat officers reduce climate change risks 0 qpurcell Mon, 04/10/2023 - 09:40 Sustainability Eric Corey Freed, Director of Sustainability, CannonDesign, shares how established designers and recently-emerged chief heat officers (CHO) can collaborate on solutions for alleviating climate change risks.

Risk 52
article thumbnail

The Future of the New-Home Design Studio

Pro Builder

The Future of the New-Home Design Studio. It's time for design studios to evolve. What have we learned from the past 18 months of a global pandemic and its ripple effects on our society and industry, and what does the future look like for new-home design studios? Wed, 07/28/2021 - 14:16. Jane Meagher.

Design 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Scheduling Tips and Tricks’ Webinar

Construction Cost Estimating

Some key players within the construction community like architects, engineers, public and private owners, construction managers, contractors , subcontractors, and designers will find the event very useful for them to get acquainted with various “tips and tricks” which can be applied to scheduling their construction projects.

article thumbnail

5 things developers should know about mass timber

BD+C

5 things developers should know about mass timber 0 qpurcell Thu, 02/15/2024 - 13:36 Mass Timber Gensler's Erik Barth, architect and regional design resilience leader, shares considerations for developers when looking at mass timber solutions. Erik Barth Regulations Mass Timber Wood The Changing Built Environment The U.N.’s

Concrete 111
article thumbnail

A modular construction solution to the mental healthcare crisis

BD+C

A modular construction solution to the mental healthcare crisis 0 qpurcell Mon, 03/18/2024 - 12:19 Healthcare Facilities Maria Ionescu, Senior Medical Planner, Stantec, shares a tested solution for the overburdened emergency department: Modular hub-and-spoke design. A Stantec-designed, two-story modular prefabricated crisis unit.

article thumbnail

Target Value Delivery in lean construction

Lets Build

The principles of lean construction are nothing new, and most construction professionals understand the risks of not using an organised, proven process when taking on a new project. This brings us to target value delivery. The same is true for creating clear targets for scheduling, energy performance, etc.

article thumbnail

The End of RFIs: It’s Time to Stop Automating Wasteful Construction Processes 

Autodesk Construction Cloud

Usually, if a GC is unable to provide satisfactory or timely information, the subcontractor forwards the RFI to the architect or engineer responsible for the project design, which can then stall jobsite work even further until the information becomes available. Teams can avoid these challenges through integrated design.