Remove Design Remove Equipment Remove Feasibility Remove Materials
article thumbnail

The Myth Of Zero Energy And Its Adverse Impact On Prevention Through Design

FDR Safety

THIS ARTICLE IS FOCUSED ON prevention through design (PTD) and why use of the term “zero energy” lockout/tagout (LOTO) for all service and maintenance tasks creates a range of adverse impacts. Examples of such impacts are: •impeding efficient and effective equipment designs when tasks (e.g., national consensus standards (e.g.,

Design 156
article thumbnail

5 ways mass timber will reshape the design of life sciences facilities

BD+C

5 ways mass timber will reshape the design of life sciences facilities Here are five reasons why it has become increasingly evident that mass timber is ready to shape the future of laboratory spaces. Here are five reasons why.

Design 113
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Electric fleet challenges and considerations

CK Power

Challenges posed by the present-day electrical grid There are inconveniences inherent in working with any new tech (like high cost of implementation, difficult integration with current equipment and a lack of standardization on key components). And we expect charging equipment to standardize on important components.

article thumbnail

It's Alive! First-Ever 3D-Printed Excavator Unveiled

Construction Equipment

Known as Project AME - Additive Manufactured Excavator - industry partners, university students, Oak Ridge National Laboratory (ORNL) researchers designed and fabricated the world’s first large scale use of steel in a 3D printing application.

article thumbnail

2024 International Energy Conservation Code Will Use a New Development Process

Pro Builder

The ICC Board also added that changes must be “technologically feasible, and life cycle cost effective, considering economic feasibility, including potential costs and savings for consumers and building owners, and return on investment.”. Requiring grid-interactive equipment for demand response. Requiring on-site solar panels.

NAHB 98
article thumbnail

The Preconstruction Phase: Understanding the Process & Risks

Levelset

Before a construction project can begin, there is a lot of planning, number-crunching, designing, and scheduling that needs to occur. An architect, designer, or design-bid contractor will perform planning and engineering services for a prospective project owner, providing them with the information they need to move forward.

Risk 52
article thumbnail

Conceptual Estimating is ideal for project feasibility study

Construction Cost Estimating

Owing to high number of design constraints and intricacy of construction a system known as conceptual cost estimation (also referred to as predesign cost estimation ) has been developed to conceptually estimate the costs for construction industries.