Credible Construction Estimate Core Elements

Job Order Contracting

A credible construction cost estimate is required prior to engaging in procurement. The follow elements are common to a credible construction cost estimate. Credible Cost Estimate Core Elements #1 Objectivity – The information used and those invovled in the creation of the construction cost estimate must be objective.

article thumbnail

Validity of a Construction Cost Estimate – Public Sector

Job Order Contracting

The validity of a construction cost estimate, the most important aspect, is often overlooked and resulting in billions of dollars was every year. A construction cost estimate must be independently validated. Key Principles There are key principles that should be adhered to when preparing a construction cost estimate.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

JOC Program Line-item Estimating

Job Order Contracting

NEVER accept a lump sum estimate for a workorder/project without a full detailed line-item estimate and review of line-times and quantities. Fully audit cost estimate and actual cost information. RSMeans Cost Data, This document is for construction cost reference information. Verify all aspects of the direct work (e.g.,

article thumbnail

Preparing Independent Government Estimates – IGEs , IGCEs

Job Order Contracting

Preparing Independent Government Estimates – IGEs is fundamental to achieving best value outcomes. Most Independent Government Cost Estimates are Not Well Documented. The usefulness of an IGE to a contracting officer and other Government interest depends largely upon its supporting documentation. FAR 36.203.

article thumbnail

Beware of Using Assemblies for Job Order Contracting

Job Order Contracting

A fundamental element is Job Order Contracting (JOC) is line item estimating which involves breaking down the cost of construction into discrete, granular tasks, each item representing a specific material, labor, and equipment components. The latter includes studs, wiring, wallboard, etc.

Contract 193
article thumbnail

MasterFormat Construction Cost Estimating

Job Order Contracting

MasterFormat Construction Cost Estimating drives cost visibility, transparency, and best value outcomes. National average cost data, with or with the uses of factors for localization, does not accurately reflect site specific variables for labor, material, and equipment. correct in all details; exact.

article thumbnail

Best Construction Cost Estimating Solution

Job Order Contracting

Here is a recommended list of considerations if you are seeking the best construction cost estimating solution for your organization. Collaborative environment – Even if there is only one estimator, it is critical to share current, actionable information with multiple internal and external parties. and Detailed BIM Information.