article thumbnail

What’s in a JOC Coefficient

Job Order Contracting

Here’s a listing of what is typically included in a construction contractor’s Job Order Contract coefficient… Contractor’s overhead and profit. Subcontractors’ overhead and profit. Traffic and work site signs and barriers. As built drawings. Employee payroll taxes, insurance, and fringe benefits.

Overhead 100
article thumbnail

Understanding the Contractor’s Job Order Contract Coefficient

Job Order Contracting

Example include, general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, and contractor’s profit. Subcontractors’ overhead and profit. Traffic and work site signs and barriers. As built drawings. Quality control.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Door Closer Hinges: A New Approach

Construction Specifier

Innovative engineering has made closer hinges more compact and functional; the new generation of products provides unique combinations of features and benefits to address door closing challenges that are not satisfactorily met by overhead surface-mounted door closers. Performance. The closer hinges have built-in door stops. Aesthetics.

article thumbnail

Hard Construction Costs

Job Order Contracting

Site – All site work and underground, aerial, water systems, drains, fire, paving, grading, sewers, etc. Landscape – Grass, lawns, trees, mulch, shrubs, fertilizer, and every other material included in the construction of the projects based on the architectural drawings. How to Estimate Hard Construction Costs.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). ORGANIZATION NAME Technical Staff / Facilities Management Department Representative(s) and authorized ORGANIZATION NAME Procurement Authority review the Contractor’s Proposal. The UPB costs should NOT include contractor overhead and profit. authorization. Job Conditions.

Contract 100
article thumbnail

Job Order Contract Coefficient – Training 101

Building Information Management

Examples of costs that may be included in the coefficient include: General and administrative and other overhead costs. subcontractor’s overhead and profit. Traffic and work site signs and barriers. As built drawings. Employee payroll taxes, insurance and fringe benefits. All waste and excess material.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a) However, informal (shop) and as-built drawings, incidental to the job, reflecting the plan of action and the completed project, are anticipated under a JOC.

Contract 227