Remove Foundation Remove Permits Remove Plans Remove Zoning
article thumbnail

Phases of Commercial Real Estate Development

Construction Marketing

This includes analyzing factors such as zoning regulations, transportation access, and market demand. After acquiring the property, the developer must design and plan the project, considering factors such as building codes and zoning regulations, the intended use of the property, and the target market.

article thumbnail

Three Easy Steps to Building a Commercial Building

Wolgast Corporation

Three-Phases to Design-Build Construction: Preliminary Design and Estimating Detailed Construction Drawings and Bidding Construction Step One/Phase I – Preliminary Design and Estimating In this First Step or Phase our Architect develops plans based on a needs analysis meeting with the building owner and representatives for a nominal fee.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Aging in Place: My Aunt Nancy’s New ADU

Pro Builder

“We dragged him over to my mom’s house about once a year for a few years to assess our plans,” Toni says. As such, obtaining a permit requires the homeowner to inform neighbors of the project and allow for public input at a zoning board meeting. Still, having that “padding” in the budget was fortunate planning.

Permits 98
article thumbnail

Step-by-step guidelines to develop a concrete block wall

Construction Cost Estimating

No of wall or fence should be permissible inside 36” of a fire hydrant and no wall, fence or foundation should be permissible inside 12” of a water meter. Makin proper plan to adjust the height, location and design of the wall on the basis of the zone, location on the community design standards.

article thumbnail

All About Site Preparation | What Is Site Preparation | Types of Site Preparation

CivilJungle

Soil testing charts many dissimilarity facts such as kind of foundation good for the site, agreement and linked guidance, rainfall chance, slope solidity, underground water level, soil power, soil categorized, and various details offered in the surveying reports. Check Zoning and Permitting with the Local Governing Body.

Site 52
article thumbnail

What Is Pavement Marking | Types of Pavement Markings & Their Meanings

CivilJungle

No passing zones. The widths and plan of longitudinal lines will be as per the following. Vehicles are permitted to transit. The centerlines markings would be two-direction no-passing zone markings for undivided two-way roadways with four or more traffic lanes (double solid yellow lines). No-Passing Zones.

Roads 52
article thumbnail

Understanding gas vapor remediation

GCP Applied Technologies

In addition, the City of Los Angeles has adopted Ordinance 175790, which states in part that building permits within certain “methane zones” will not be issued until the submittal of detailed plans for the installation of suitable methane mitigation systems.