article thumbnail

Less than 20% of Green Building Contracts Properly Drafted

Green Building Law Update

In a recent review of contracts involving green building construction projects, less than 20% had properly drafted provisions addressing green building matters. The contracts were each received by this law firm during 2016 from clients and prospective clients in matters involving a dispute at a green building construction project.

Drafting 120
article thumbnail

How to use Etabs 2016 for slab design

Construction Cost Estimating

This construction video provides useful information on how to use Etabs 2016 for creating effective slab design. This newest software can be used to make integrated structural analysis, design and drafting of building systems.

Design 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Now is the Time to Revise your Green Building Contracts

Green Building Law Update

Moreover, owners will only be able to register projects under the LEED 2009 rating system until October 31, 2016 and thereafter all projects must register under LEED v4. It is beyond dispute that the best way to mitigate risk in a sustainable project is a properly drafted contract. With the U.S. as well as to a host of green codes.

Green 159
article thumbnail

Revit 2016 - Rendering Engines

Revit OpEd

Revit 2016 has both Mental Ray and Autodesk Raytracer options available to us when we decide to render via our desktop (not using Cloud Rendering). This is using Mental Ray (3:27 seconds at Medium) This is using Raytracer (2:53 at medium) This time I switched to rending the same model and view using the Draft setting.

Revit 40
article thumbnail

Now is the Time to Revise your Green Building Contracts

Green Building Law Update

Moreover, owners will only be able to register projects under the LEED 2009 rating system until October 31, 2016 and thereafter all projects must register under LEED v4. It is beyond dispute that the best way to mitigate risk in a sustainable project is a properly drafted contract. With the U.S. as well as to a host of green codes.

Green 120
article thumbnail

OSHA Electronic Records Submission Delayed, But Not for Long

FDR Safety

OSHA recently announced another delay in the deadline for employers to electronically submit their 2016 injury and illness data to the agency. The inclusion of an economic analysis signals that the changes to the recordkeeping rule will be substantial because such analysis is only legally required for major changes to rules.

OSHA 185
article thumbnail

LEAN Construction Delivery, The Primary Challenge to BIM

Job Order Contracting

Classification Criticality – Architecture, Engineering, Construction, & Life-cycle Facility Management – A Draft White Paper. JOC Performance – 2016 Industry Study . BIM for Facility Management. The Evolution of Construction Cost Estimating Technology. Maintenance and Repair of Federal Facilities.

BIM 100