Remove CAD Remove Document Remove Drawings Remove US
article thumbnail

Driving Quality and Improving Communication to Prepare for New Regulations with Vrolijk in the Netherlands

Autodesk Construction Cloud

With rapid expansion and the need to improve information flow on their projects, Vrolijk worked with NTI CAD & Company , an Autodesk Construction Cloud partner, to identify the best solution to fit their needs. “To Investing in technology to expand workflows. Investment to futureproof the business. “We An iterative journey.

article thumbnail

BIM is dead, please do not resuscitate!

DebunkTheBIM

The new generation of 20 somethings (and younger) in training or about to enter the AEC, are taught that documenting building is about creating drawings. A good modeller will have plenty of opportunities to model, but rule number one is, that the ‘drawings’ are priority, what consultancies get paid for.

BIM 68
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Here is why Autodesk’s monopoly over the Global AEC is not good, not even for Autodesk:

DebunkTheBIM

It started off with CAD, then, when BIM was getting strong enough to stay – it extended over almost anything to do with Construction Information Management. Almost, I state – as the non-graphical data management is still somewhat outside its claws, i.e. project, people and time document management.

article thumbnail

Housing, Industrialized: Designing for Off-Site

Pro Builder

Understanding the capabilities of the factory allowed us to meet the attainability goals for the project,” says White, director of design at Dahlin Group , in Irvine, Calif. Our CAD [computer-aided design] modelers and drafters have become experts in how to build a house,” Carpenter says. Not so in a factory.

Site 92
article thumbnail

How Khansaheb Reduced Snagging Administration by 60% with Autodesk Build

Autodesk Construction Cloud

In 2018, Eoin Nield joined as the company’s first BIM Manager, with the remit of supporting the transition from traditional CAD design to integrated delivery methods. “My People would carry around huge rolls of drawings, which would be stored in site offices. Document controllers are not required to chase up actions.”.

article thumbnail

Behind the Build: Interview with Matthew Keck, BIM Manager at Metromont 

Autodesk Construction Cloud

Walk us through your career and what led you to become BIM Manager I began in construction in the early 2000s, predominantly in grading, dirt work with heavy equipment, and did that in both commercial and residential construction. So I picked that up and used it post-graduation. We have taken the role of visionaries.

BIM 98
article thumbnail

KeyNotes - You Keep Using that Word.

Revit OpEd

When software uses the same word we routinely use to describe something we do it is supposed to make it easier to understand and use. A good many of us in the AEC business are familiar with the concept of using keynotes on drawings. In Revit there are three ways we can apply keynotes to drawings.