Remove Consulting Remove Design Remove Documentation Remove Engineering
article thumbnail

Behind the Build: Interview with Mostafa Saber, BIM & Design Manager at Diamond Developers

Autodesk Construction Cloud

We sat down with Mostafa Saber , BIM & Design Manager at Diamond Developers as he walked us through his career journey, the challenges he faces while modernising and his vision for the future of construction. Within five years, I exclusively used Autodesk’s Revit to deliver all my architectural designs.

BIM 119
article thumbnail

The practical magic of the design process

BD+C

The practical magic of the design process 0 qpurcell Tue, 01/30/2024 - 14:02 Designers Designers bridge very different worlds, and there can be an air of mystery about the process and the various roles within it. Weaving all of those threads together is really the starting point of a design.

Design 72
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

JOC Program Manager’s Duties

Job Order Contracting

Here’s just a brief list of JOC Program Manager’s duties for a real property owner: Plan, organize, coordinate and administer facilities design and complex construction engineering projects with various entities. Use Job Order Contracting (JOC) procedures, software and documentation.

Permits 152
article thumbnail

Civil Engineering Software | List of Civil Engineering Software | List of Engineering Software

CivilJungle

Introduction of Civil Engineer Software: There is multifarious software accessible which are utilized in Civil Engineering. The Civil Engineering Softwares are surging manifold day by day. Here could be a list of SOFTWARE which are outrageously employed by many Civil Engineers all round the world. Autocad Civil 3d.

article thumbnail

Validity of a Construction Cost Estimate – Public Sector

Job Order Contracting

The use of consultants to prepare estimates must be carefully structured and reviewed, to make sure that no conflicts of interest exist from a Government-Contractor relationship aspect. The documentation should be in a form that can be understood, checked and verified. Avoiding false precision and early optimism.

article thumbnail

Considering a Job Order Contract?

Job Order Contracting

Assure JOC program processes and structure mutually benefit your organization and awarded JOC contractors and can be implemented without the need for paid on-site “JOC consultant” 2. Prequalify potential JOC contractors. Contracts and individual Projects/Work Orders within JOC should have established dollar limits.

Contract 205
article thumbnail

LEAN Job Order Contracting – What Public Sector Facilities Professionals Need to Know

Job Order Contracting

Job Order Contracting (JOC) has been distorted into a way to simply speed the procurement of repair, renovation, and new build construction, bypassing procurement rigors and doing little to assure mutually beneficial benefit to owners and design-builder or overall efficiency. Enhanced owner and design-builder capabilities.

Contract 220