article thumbnail

Architectural Drafting Services: Custom Home Design

Green Home Design Architect

At the same time, they did not require full architectural services, only limited drafting services , but wanted to work with an architect to pull their design ideas together and make them work with their land’s difficult terrain and elevation issues. We were happy to assist them by providing drafting services for their new custom home.

article thumbnail

Water is the Most Important ESG Factor

Green Building Law Update

I am excited to be presenting a fast paced and fun one hour virtual program, “ESG an Emergent and Fast Growing Area of the Law” for the Maryland State Bar Association, and Not just for lawyers, on December 14, 2021 at noon. Register today for the live virtual program. Potable water use reduction may be the most important ESG factor.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A position is vacant for Structural Engineer in Brisbane

Construction Cost Estimating

The Company: Van der Meer Consulting, a multi-disciplinary Structural and Civil Consulting Engineering group with various office locations in Brisbane, Melbourne and Sydney. This fast growing company is presently inviting application for an aptly qualified Structural Engineer for the office located in Brisbane.

article thumbnail

April 2017 Newsletter – A “New, New OSHA” Emerges

FDR Safety

OSHA wants to hear from the public on draft Process Safety Management guidance documents. OSHA’s On-site Consultation Program helps Utah manufacturer reduce workplace injuries and illnesses. Fred’s presentation: “Why to be Safe vs. How to be Safe”. Parsons re-approved for VPP Corporate Program.

OSHA 149
article thumbnail

Difference Between Sketching and Drawing | What Are Conceptual Sketches | Architecture Concept Drawing | Types of Drawings for Building Design

CivilJungle

The drafting process may impose limitations on the size that is realistically workable. The contractor will generally mark up changes to the ‘final construction issue’ drawings on-site using red ink, and these can then be used by the consultant team to create record drawings showing the completed project. #9. Size and Scale.

article thumbnail

A Plea for Clarity in Construction Contracts

Construction Lawyer

Frequently, the parties do not consult with a construction attorney when drafting contracts. The “plain and simple” document drafted by the architect is not clear. Clarity is required and is often not present because the architect is not trained to draft contracts. An example.

article thumbnail

LIVEXCHANGE 2012: Where Top Projects Find the Best Locations

Buisness Facilities Contributed Content

As always at LiveXchange, corporate delegates bearing projects and economic development agency representatives also were treated to incisive presentations on critical site selection issues from an all-star lineup of industry experts. By the time BF Publisher and Group C Media co-President Ted Coene gave his closing remarks on Oct.

Florida 63